My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
05-13-19
>
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:50:43 PM
Creation date
8/16/2019 4:46:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
598
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
auto thefts, auto burglaries and conuiercial burglaries. These <br /> anticipated increases in crimes would increase demand on police <br /> services, but the project would also generate additional tax revenues <br /> available for augmenting such services. <br /> Mitigation Measures <br />L. <br /> The applicant should provide a private security force that <br /> would respond to business and customer needs. The presence of a <br />L security forctwould also have a deterrent effect on crime. <br />LI Fire <br />-t <br /> Project Impacts <br /> In addition to Fire Station #1, the project would require an <br /> initial response from an additional engine company and an additional <br /> truck company. Fire Station #5 would be one of the additional <br />Li responding companies, as well as Station 12. The project would also <br /> increase demand for paramedic services. However, the project would also <br /> generate additional tax revenues available for augmenting such services. <br /> Mitigation Measures <br />-L The project developers shall maintain the current underground <br /> water reservoir with auxiliary pumps (or provide its equivalent at an <br /> alternative location) and expand such system upon development of the <br />Li <br /> site as necessary for compliance with Fire Code requirements. <br />ii <br /> 2.14 Energy Conservation <br /> The proposed project can be expected to result in an increase <br /> in energy consumption. The estimated net increase in energy consumption <br /> figures associated with the project are 8,656,292 Kwh per month of <br /> electricity and a natural gas consumption of 62,507,440 cubic feet per <br /> month. <br /> 16
The URL can be used to link to this page
Your browser does not support the video tag.