Laserfiche WebLink
Sewer <br /> Project Impacts <br /> The project is estimated to generate approximately 490,000 <br /> gallons of sewage per day. The existing sewage system does not have the <br /> capacity to serve the project and therefore, additional sewer facilities <br /> would be required. The size and location of the required sewer <br /> facilities would be determined when final site plans become available. <br /> Mitigation Measures <br />ii- <br /> No mitigation measures are proposed. <br />C.; <br /> Solid Waste <br /> Project Impacts <br /> The proposed project would result in a net generation of <br /> approximately 33 tons of solid waste per day. Since the County <br /> anticipates having adequate landfill capacity to last beyond the year <br /> 2000, no significant adverse impacts are anticipated. However, the <br /> project would have an incremental impact on the reduction of the life <br /> capacity of the Coyote Canyon landfill site. <br /> Mitigation Measures <br /> No mitigation measures are proposed. <br /> Police <br /> Project Impacts <br /> The types of crimes that can reasonably be expected to <br /> increase due to the project would be larceny, crimes against persons, <br /> 15