Laserfiche WebLink
can occur during the peak hour forcing trips to be redistributed over a <br /> longer span of time. Employees and shoppers will have to accept and <br /> adjust to new peak period conditions. <br /> Construction of transportation facilities will change the <br /> entire look of the area into a high density downtown CBD rather than the <br />c suburban character that exists today. <br /> If the development proceeds and the associated transportation <br />Id <br /> improvements either fail to materialize or lag the pace of development, <br /> then severe congestion will develop on Main Street. Main Street <br /> congestion is influenced not only by Fashion Square but by redevelopment <br /> in the area. Implementation of the Phase Two TSIP Plan is dependent <br /> upon securing additional funds to cover $8.66 Million for identified but <br /> unfunded projects. <br /> Implementation of some of the freeway ramp improvements on <br /> Main Street will require acquisition and relocation of residential and <br /> commercial properties. Four single family homes and one or two <br /> commercial businesses on Main Street will be eliminated to make way for <br /> the new freeway ramps. <br />.1 <br /> 118