My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
05-13-19
>
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:50:43 PM
Creation date
8/16/2019 4:46:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
598
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.7 Noise <br /> 5.7.1 Environmental Setting <br /> Vehicle traffic is the primary noise source in the project <br /> area. The Santa Ana Freeway (1-15), Garden Grove Freeway (Route 22), <br /> and Main Street are all located within close proximity to the site. <br /> Noise exposure contours for these highway segments were calculated and <br /> are presented in Appendix III of this report. Figure 28 illustrates the <br /> general outline of the unattenuated 65 dB contour in the project area. <br />LU 65 dB or greater is typically considered excessive for certain types of <br /> "noise sensitive" uses, i.e., residential. <br />LI--; <br /> Since the primary access to the site will be along Main <br /> Street, "peak hour" traffic noise measurements were made at a <br /> residential area which is located near Owens Drive and Main Street <br /> (Refer to Figure 28). A series of noise measurements were made at <br /> locations 1, 2, and 3 to establish ambient levels in this area which <br /> could be impacted by increased traffic from the project along Main <br /> Street. Noise samples of 12-minute periods taken at each location <br /> exhibited a range of 64 dB(A) at location 1, 57 dB(A) at location 2, <br /> and 52 dB(A) at location 3. Results of the noise survey also indicated <br /> that any change in traffic volumes along Main Street would change noise <br /> levels that would only be noticeable within the first 100-200 feet of <br /> Main Street. This is due to the shielding effect of homes along Owens <br /> Drive as one proceeds in an easterly direction away from Main Street. <br /> (Refer to noise measurement data in Appendix III of this report). <br /> Appendix III also contains supplemental noise measurement data <br /> collected near Broadway Street located southwest of the project site. <br /> CALTRANS proposes to extend Broadway Street over the Santa Ana Freeway. <br /> This overpass will provide an additional link for traffic between the <br /> project site and the west side of the Santa Ana Freeway. Results of <br /> this noise measurement study indicated that the noise levels are in the <br /> 119
The URL can be used to link to this page
Your browser does not support the video tag.