My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
05-13-19
>
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:50:43 PM
Creation date
8/16/2019 4:46:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
598
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
55394.00053\32005762.1 <br />1983 Final EIR Mitigation <br />Measures (MMs) <br />Applicable to MainPlace Mall Transformation <br />Mitigation Program? Responsibility Timing <br />Monitor <br />(Signature <br />Required) <br />(Date of <br />Compliance) <br />preferred) in trade-off against <br />the acquisition of Sales Parcels <br />3 and 5. The land area so <br />offered should be sufficient to <br />allow a total of at least 351 <br />parking spaces serving the <br />Fidelity Savings building <br />assuming a maximum <br />permitted amount of small car <br />spaces, with the Agency and/or <br />Project Participants bearing <br />any necessary design and <br />installation costs. <br />MM 5.1-1: (d) Ultimate <br />development of the project site <br />should occur through the <br />specific plan process. The <br />specific plan should provide <br />information on how the project <br />would incorporate pedestrian <br />walkways, building <br />configurations, and open space <br />with key transit routes. <br />Applicable and ongoing <br />Implementation: <br />Applicant <br /> <br />Monitoring: City Planning <br />Department <br />Upon approval of the <br />Specific Plan <br /> <br />As individual <br />development <br />projects within the <br />Specific Plan are <br />submitted for <br />Development Project <br />Review process <br /> <br />Final EIR Section 5.4: Biota <br />MM 5.4-1: The Participation <br />Agreement requires the Project <br />Participant to provide <br />adequate landscaping on the <br />Applicable and ongoing, as modified: The <br />wording has been updated to be consistent with <br />Section 5, Administration and Implementation, <br />of the MainPlace Specific Plan. The revision does <br />Implementation: <br />Applicant <br />Monitoring: City Planning <br />As individual <br />development <br />projects within the <br />Specific Plan are <br />
The URL can be used to link to this page
Your browser does not support the video tag.