Laserfiche WebLink
55394.00053\32005762.1 <br />1983 Final EIR Mitigation <br />Measures (MMs) <br />Applicable to MainPlace Mall Transformation <br />Mitigation Program? Responsibility Timing <br />Monitor <br />(Signature <br />Required) <br />(Date of <br />Compliance) <br />community on aesthetic <br />grounds. <br />Pursuant to the Participation <br />Agreement, all buildings would <br />be constructed of high <br />architectural quality with <br />landscaped areas. The <br />structures must be effectively <br />and aesthetically designed. The <br />shape, scale of volume, <br />exterior design and exterior <br />finish of each building must be <br />consistent with, visually related <br />to, physically related to and an <br />enhancement to each other <br />and the surrounding project <br />area. Landscaping would be <br />provided to integrate this <br />project with adjacent projects. <br />Architectural, landscape and <br />site plans must be approved by <br />the Agency. <br />constructed of high architectural quality <br />with landscaped areas. The structures <br />must be effectively and aesthetically <br />designed. The shape, scale of volume, <br />exterior design and exterior finish of each <br />building must be consistent with, visually <br />related to, physically related to and an <br />enhancement to each other and the <br />surrounding project area. Landscaping <br />would be provided to integrate this <br />project with adjacent projects. The <br />Planning and Building Agency Executive <br />Director or designee shall be the review <br />and approval authority for architectural, <br />landscape, and site plans. <br />Review process <br />Final EIR Section 5.13: Public Services and Utilities <br />MM 5.13-1: Police: The <br />Participants should provide a <br />private security force to <br />respond to business and <br />customer needs. The presence <br />Applicable and ongoing <br />Implementation: <br />Applicant <br /> <br />Monitoring: City Planning <br />Ongoing