My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
05-13-19
>
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:50:43 PM
Creation date
8/16/2019 4:46:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
598
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
55394.00053\32005762.1 <br />1983 Final EIR Mitigation <br />Measures (MMs) <br />Applicable to MainPlace Mall Transformation <br />Mitigation Program? Responsibility Timing <br />Monitor <br />(Signature <br />Required) <br />(Date of <br />Compliance) <br />of a security force would also <br />have a deterrent effect on <br />crime. <br />Department <br />MM 5.13-2: Fire: The project <br />developers shall maintain the <br />current underground water <br />reservoir with auxiliary pumps <br />(or provide its equivalent at an <br />alternative location) and <br />expand such system upon <br />development of the site as <br />necessary for compliance with <br />Fire Code requirements. <br />Applicable and ongoing, as modified: There are <br />four existing fire service water connections to <br />the City main in MainPlace Drive. Infrastructure <br />upgrades will be provided as needed to meet <br />fire flow requirements of the Orange County <br />Fire Authority. <br />MM 5.13-2: Fire: The project developers <br />shall expand fire service infrastructure <br />such system upon development of the <br />site as necessary for compliance with Fire <br />Code requirements. <br />Implementation: <br />Applicant <br /> <br />Monitoring: City Planning <br />Department <br />Upon issuance of <br />building permits <br /> <br />Final EIR Section 5.14: Energy Consumption <br />MM 5.14-1: The orientation of <br />building glazing areas, <br />overhangs, and site <br />landscaping should be selected <br />in order for solar radiation to <br />reach indoor areas during the <br />winter months to reduce <br />heating loads. The same <br />principal should be <br />incorporated for the summer <br />months, so that building <br />glazing, overhangs and <br />Not applicable: The mitigation measure has <br />been superseded by building code <br />requirements. As individual projects are <br />considered by the City of Santa Ana, the <br />buildings would be required to comply with the <br />most current version of Title 24. The energy <br />efficiency standards of Title 24 substantially <br />exceed the air quality and energy conversation <br />levels that would occur with the Final EIR <br />measure. Therefore, the project’s compliance <br />with Title 24 which would fulfill the <br />requirements of this mitigation measure. <br />-- -- --
The URL can be used to link to this page
Your browser does not support the video tag.