My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
05-13-19
>
7- AA19-04; TPM19-01;DA18-02_2800 N MAIN STREET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2019 4:50:43 PM
Creation date
8/16/2019 4:46:03 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
598
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• Depict and note the exact location(s) of the trash and recycling receptacles. <br />• The residential element of a project with 3 or more dwelling units will require a <br />minimum combined trash and recycling service level of 0.5 cubic yards (CY) per <br />residential unit, per SAMC Sec. 16-37. <br />• Minimum 40’ x 16’ wide staging area shall be available on service days from 6 a.m. <br />to 6 p.m. <br />• Minimum vertical clearance of 25’ at the staging area for bin service clearance <br />• Minimum 13’ vertical clearance for scout truck. <br />• All staging areas are to be onsite. No street staging is permitted. <br />• 42’ on a 90-degree turn radius <br />• All driveway and staging areas must be able to sustain a minimum gross weight of <br />60,000 lbs. per vehicle. <br />• Maximum size of bin shall be 4 cubic yards. <br />• Maximum number of pick-ups is 2 times per week for residential projects only. <br />• Depict the trash trucks’ turning radius at all proposed internal corners. <br />• Provide complete circulation for trash trucks, backing up into the streets is not <br />allowed for safety reasons. <br />• All items must be noted on the final site plan. <br /> <br />Provide a copy of the will serve letter obtained from Waste Management, Inc. Contact <br />Walter Roberts at (714) 371-6747 or wrobert1@wm.com <br /> <br />23. Revise the site plan and tentative map to depict and note the construction of full depth <br />rubberized asphalt pavement along Main Place Drive and all private aisles per City <br />standards and approved street improvement plans. Not Addressed. <br /> <br />24. Revise the site plan and tentative map to depict and note the construction of full depth <br />rubberized asphalt pavement along the project frontage on Main Street to the centerline of <br />Main Street per City standards and approved street improvement plans. Not Addressed. <br /> <br />25. Proposed phasing for off-site improvements shall be included in Development Agreement <br />including scheduling and timelines for construction completion. <br /> <br />26. Add a note to the site plan and the tentative map to read “Install 24” Box Street trees <br />every 35’ per the City Standards and approved plan, as needed per the City Standards and <br />the approved street improvement plans. Please contact the tree section supervisor at <br />(714) 647-3304 for tree species”. Note shown on Tentative Map Sheet 1 <br /> <br />27. Revise the site plan to depict and note the removal of existing street lights and the <br />installation of new street lights including all fixtures luminaries, poles and conduits <br />required for power supply etc. per new City Standards along property frontage on Main
The URL can be used to link to this page
Your browser does not support the video tag.