Laserfiche WebLink
Place Drive and Main Street. Contact Tyrone Chesanek at (714) 647-5045 for type of <br />light and City Standards. Not Addressed. <br /> <br />28. Revise the site plan to depict and note the installation of drought tolerant landscape in all <br />public medians and parkways along Main Place Drive and Main Street between Main <br />Place Drive and the 22 Freeway per the City of Santa Ana Parkway Guide line for <br />Drought Tolerant plants. http://www.santa- <br />ana.org/sawatersmart/documents/SAParkwaysGuidelines27May2015.pdf Not Addressed <br /> <br />29. Revise the site plan/tentative map to add note “Street tree removal within the public right- <br />of-way is subject to approval by the Environmental and Transportation Advisory <br />Committee (ETAC). A letter requesting the removal of existing street tree(s) that conflict <br />with the proposed improvements will be provided to the City of Santa Ana prior to site <br />plan approval.” The City will present the information to the ETAC committee for action, <br />see sample letter attached as Exhibit “C”. Noted on sheet 1. <br /> <br />30. Submit preliminary surface drainage/utility plan that depicts all applicable “Site Design,” <br />structural “Source Control,” and “Treatment Control” Best Management Practices <br />(BMPs) in accordance with the Orange County Drainage Area Management Plan <br />(DAMP) and the City of Santa Ana Local Implementation Plan (LIP). Site drainage <br />should go to the landscape swale and should not be in conflict with the landscape <br />plantings. Submitted and under review. <br /> <br />NOTE: Go to the Planning & Building permit counter for issuance of a grading permit <br />number before submitting plans to the Public Works counter for plan checking. <br /> <br /> <br />23. Pay all related plan checking deposits for required Public Works Agency submittals. <br />These include preliminary WQMPs, preliminary grading plans, traffic control study, <br />drainage study, sewer capacity analysis and hydrological study. These may be paid at the <br />Public Works counter at the time of submittal of these items. Not Paid, Please make the <br />next submittal at the Development Engineering Counter and Pay related review fees. <br /> <br />24. Submit two copies of the preliminary WQMP for review and approval to the Public <br />Works Agency. Go to www.santa-ana.org/pwa/stormdrain/WaterQualityManagement <br />PlanTemplates.asp for information on preparation of WQMPs. Submitted, under review. <br /> <br />a. Preliminary Water Quality Management Plan (WQMP)/surface drainage/utility plan <br />should depict all applicable “Site Design,” structural “Source Control,” and <br />“Treatment Control” Best Management Practices (BMPs) in accordance with the most <br />current Orange County Drainage Area Management Plan (DAMP) and the City of <br />Santa Ana Local Implementation Plan (LIP) <br />