My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-10-19_AGENDA PACKET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
06-10-19
>
06-10-19_AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2019 9:54:24 AM
Creation date
8/16/2019 4:55:04 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />7-Eleven Convenience Store and Service Station Project <br />Mitigation Monitoring and Reporting Program <br />Table 1 (cont.): 7-Eleven Convenience Store and Service Station Project Mitigation Monitoring and Reporting Program <br />Mitigation Measures Method of Verification <br />construction area. Placement and height will be determined by <br />a qualified wildlife biologist, but the height of the bat house <br />will be at least 15 feet. Bat houses will be multi -chambered <br />and will be purchased or constructed in accordance with CDFW <br />standards. The number of bat houses required will be <br />dependent upon the size and number of colonies found, but at <br />least one bat house will be installed for each pair of bats (if <br />occurring individually), or of sufficient number to <br />accommodate each colony of bats to be relocated. <br />MM BIO-1b: If construction activity associated with Confirm pre -construction <br />development of the property is to occur during nesting bird surveys for nesting birds <br />season (February 1 through August 31), a qualified biologist were conducted. <br />shall conduct a pre -construction survey for nesting birds to <br />identify any potential nesting activity. The pre -construction <br />surveys for nesting birds shall be conducted within 14 days <br />prior to any construction -related activities (grading, ground <br />clearing, etc.). If nesting birds are identified on -site, a buffer <br />(e.g., 250 feet for raptors, 100 feet for native songbirds) shall <br />be maintained around the nests; no construction -related <br />activities shall be permitted within the buffer. A qualified <br />biologist shall monitor the nests, and construction activities <br />may commence within the buffer area at the discretion and in <br />the presence of the biological monitor. This mitigation measure <br />is not required if construction activities occur outside of the <br />nesting bird season (September 1 through January 31). <br />FirstCarbon Solutions <br />Y:\Publications\Client(PN-1N)\0327\03270041\MMRP\03270041 City of Santa Ana 7-Eleven MMRP.docx <br />Verification of Completion <br />Responsible for <br />Timing of Verification Verification Date Initial <br />Prior to construction City of Santa Ana <br />activities. <br />1-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.