My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06-10-19_AGENDA PACKET
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2019
>
06-10-19
>
06-10-19_AGENDA PACKET
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2019 9:54:24 AM
Creation date
8/16/2019 4:55:04 PM
Metadata
Fields
Template:
PBA
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />7-Eleven Convenience Store and Service Station Project <br />Mitigation Monitoring and Reporting Program <br />Table 1 (cont.): 7-Eleven Convenience Store and Service Station Project Mitigation Monitoring and Reporting Program <br />Verification of Completion <br />Responsible for <br />Mitigation Measures <br />Method of Verification Timing of Verification Verification Date Initial <br />7. Geology and Soils <br />MM GEO-1: Earthwork Construction <br />Review and approval of Prior to issuance of City of Santa Ana <br />• Site preparation shall begin with the removal of existing <br />construction and grading permits <br />buildings, pavement, buried slabs and foundations, <br />earthwork plans <br />vegetation, highly organic soil, leach lines, septic tanks, and <br />any other unsuitable materials. Existing underground utilities <br />within the proposed construction areas shall be completely <br />removed and/or rerouted. Grading shall conform to the <br />guidelines presented in the 2016 CBC, as well as the <br />requirements of the City of Santa Ana and Orange County. <br />• Building Pad Foundation Areas: All undocumented fill shall <br />be removed from below the proposed building footprint, if <br />encountered. The removal of soil fill shall extend at least 5 <br />feet beyond the building perimeter unless constrained by <br />existing structures or improvements. The removals shall <br />extend to a depth of at least 3 feet below the bottom of the <br />lowest foundation. The removal depth below the building <br />footprint shall be relatively level to provide a uniform <br />compacted fill mat. <br />The bottom of the remedial grading excavations shall be <br />scarified to a depth of 8-inches, moisture conditioned to within <br />0 to 4 percentage points above the optimum moisture content <br />and compacted to at least 95 percent relative compaction <br />based on the ASTM D1557 laboratory test procedure. All <br />references to optimum moisture content and relative <br />compaction in this report are based on this test method. <br />• Pavement and Hardscape: Remedial grading for pavement <br />and hardscape areas shall include removal of the existing <br />soils to a depth of at least 2 feet below the existing ground <br />surface or subgrade elevation, whichever is lower. The soil <br />exposed at the base of the excavation shall be scarified to a <br />FirstCarbon Solutions <br />3 <br />Y:\Publications\Client(PN-1N)\0327\03270041\MMRP\03270041 City of Santa Ana 7-Eleven MMRP.docx <br />1-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.