Laserfiche WebLink
City of Santa Ana <br />7-Eleven Convenience Store and Service Station Project <br />Mitigation Monitoring and Reporting Program <br />Table 1 (cont.): 7-Eleven Convenience Store and Service Station Project Mitigation Monitoring and Reporting Program <br />Mitigation Measures <br />• The construction contractor shall utilize "quiet" models of air <br />compressors and other stationary noise sources where <br />technology exists. <br />• At all times during project grading and construction, the <br />construction contractor shall ensure that stationary noise - <br />generating equipment shall be located as far as practicable <br />from sensitive receptors and placed so that emitted noise is <br />directed away from the nearest residential land uses. <br />• The construction contractor shall designate a noise <br />disturbance coordinator who would be responsible for <br />responding to any local complaints about construction noise. <br />The disturbance coordinator would determine the cause of <br />the noise complaints (starting too early, bad muffler, etc.) <br />and establishment reasonable measures necessary to <br />correct the problem. The construction contractor shall visibly <br />post a telephone number for the disturbance coordinator at <br />the construction site. <br />• The construction contractor shall limit construction activities <br />to the hours between 7:00 a.m. and 8:00 p.m. Monday <br />through Saturday. Construction activities are prohibited on <br />Sundays and federal holidays. <br />Transportation <br />Method of Verification <br />MM TRANS-1: Ensure adequate sight distance is provided at Review and approval of <br />each project access location per the City of Santa Ana. Sight site plans and conduct on - <br />distance at all project access points should be reviewed with site inspections <br />respect to City of Santa sight distance standards at the time of <br />preparation of final grading, landscape, and street <br />improvement plans. <br />Responsible for <br />Timing of Verification I Verification <br />Prior to grading City of Santa Ana <br />permits and prior to <br />certificate of <br />occupancy <br />Verification of Completion <br />Date I Initial <br />FirstCarbon Solutions 14 <br />YI\PubllcalIoi(PN1N)\IXi27\IXi9PN1\MMRP\0iPOMl City of5anta Ana ]-Eleaen MMRP. dou <br />