Laserfiche WebLink
City of Santa Ana <br />7-Eleven Convenience Store and Service Station Project <br />Mitigation Monitoring and Reporting Program <br />Table 1 (cont.): 7-Eleven Convenience Store and Service Station Project Mitigation Monitoring and Reporting Program <br />Responsible for <br />Verification of Completion <br />Mitigation Measures <br />Method of Verification Timing of Verification <br />Verification <br />Date <br />Initial <br />MM GEO-6: Percolation Testing <br />Conduct on -site <br />During and after <br />City of Santa Ana <br />Final percolation testing shall be performed in as graded <br />inspections <br />grading <br />conditions so that effects from soil compaction are <br />incorporated in the test results. <br />MM GEO-7: Post -Investigation <br />Review and approval of <br />Prior to construction <br />City of Santa Ana <br />Final project grading and foundation plans, foundation details <br />construction plans <br />activities <br />and specifications shall be reviewed by a Geotechnical <br />Engineer prior to construction to check that the intent of the <br />recommendations presented herein have been applied to the <br />design. Following review of plans and specifications, <br />observation during construction shall be performed to <br />correlate the findings of this exploration with the actual <br />subsurface conditions exposed. <br />9. Hazards and Hazardous Materials <br />MM HAZ-1: Environmental personnel shall be present on -site <br />Confirm the presence of <br />During UST <br />City of Santa Ana, <br />when the excavation for the new USTs are completed to <br />an environmental <br />excavation <br />Department of Toxic <br />establish a baseline at the time of occupancy of the 7-Eleven <br />personnel <br />Substance Control <br />convenience store. <br />(DTSC) <br />13. Noise <br />MM NOI-1: To reduce potential construction noise impacts, the <br />Conduct on -site <br />During construction <br />City of Santa Ana <br />following multi -part mitigation measure shall be implemented <br />inspections to ensure that <br />activities <br />for the proposed project: <br />the mitigation measures <br />• The construction contractor shall ensure that all equipment <br />have been implemented. <br />driven by internal combustion engines shall be equipped <br />with mufflers, which are in good condition and appropriate <br />for the equipment. <br />• The construction contractor shall ensure that unnecessary <br />idling of internal combustion engines (i.e., idling in excess of <br />5 minutes) is prohibited. <br />FirstCarbon Solutions 13 <br />YI\PubllcalIoi(PN1N)\IXi27\IXi9PN1\MMRP\0iPOMl City of5anta Ana ]-Eleaen MMRP. dou <br />