My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-067 - Adopting Mitigated Negative Declaration, Environmental Review No. 2017-140
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-067 - Adopting Mitigated Negative Declaration, Environmental Review No. 2017-140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2019 8:50:26 AM
Creation date
8/22/2019 8:32:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-067
Date
7/16/2019
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />City of Santa Ana <br />7-Eleven Convenience Store and Service Station Project <br />Mitigation Monitoring and Reporting Program <br />Table 1: 7-Eleven Convenience Store and Service Station Project Mitigation Monitoring and Reporting Program <br />Responsible for <br />Verification of Completion <br />Mitigation Measures <br />Method of Verification <br />Timing of Verification <br />Verification <br />Date <br />Initial <br />4. Biological Resources <br />MM 13I0-1a: Prior to demolition, a qualified wildlife biologist <br />Confirm pre -construction <br />Prior to demolition <br />City of Santa Ana <br />will conduct clearance surveys for special -status bats <br />surveys for special -status <br />concurrently with the nesting birds pre -construction survey to <br />bats and nesting birds <br />confirm there is no roosting on -site. Survey methodology may <br />were conducted. <br />include visual surveys of bats (e.g., observation of bats during <br />foraging period), inspection for suitable habitat, bat sign (e.g., <br />guano), or use of ultrasonic detectors (Anabat, etc.). Visual <br />surveys will include the existing vacant structure and trees <br />located on the project site. The type of survey will depend on <br />the condition of the potential roosting habitat. If no bat roosts <br />are found, then no further study is required. <br />If evidence of bat use is observed, the number and species of <br />bats using the roost will be determined. Bat detectors may be <br />used to supplement survey efforts. <br />If roosts are determined to be present and must be removed, <br />the bats will be excluded from the roosting site before the <br />facility is removed. A mitigation program addressing <br />compensation, exclusion methods, and roost removal <br />procedures will be developed prior to implementation. <br />Exclusion methods may include the use of one-way doors at <br />roost entrances (bats may leave but cannot not reenter), or <br />sealing roost entrances when the site can be confirmed to <br />contain no bats. Exclusion efforts may be restricted during <br />periods of sensitive activity (e.g., during hibernation or while <br />females in maternity colonies are nursingyoung). <br />If roosts cannot be avoided or it is determined that <br />construction activities may cause roost abandonment, such <br />activities may not commence until permanent, elevated bat <br />houses have been installed outside of, but near to, the <br />FirstCarbon Solutions <br />YI\PubllcalIoi(PN1N)\IXi2]\IXi9PN1\MMRP\0iPOMl City of5anta Ana ]-Eleaen MMRP. dou <br />
The URL can be used to link to this page
Your browser does not support the video tag.