My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019-067 - Adopting Mitigated Negative Declaration, Environmental Review No. 2017-140
Clerk
>
Resolutions
>
CITY COUNCIL
>
2011 -
>
2019
>
2019-067 - Adopting Mitigated Negative Declaration, Environmental Review No. 2017-140
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2019 8:50:26 AM
Creation date
8/22/2019 8:32:39 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Resolution
Doc #
2019-067
Date
7/16/2019
Destruction Year
P
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />7-Eleven Convenience Store and Service Station Project <br />Mitigation Monitoring and Reporting Program <br />Table 1 (cont.): 7-Eleven Convenience Store and Service Station Project Mitigation Monitoring and Reporting Program <br />Responsible for <br />Verification of Completion <br />Mitigation Measures <br />Method of Verification Timing of Verification <br />Verification <br />Date <br />Initial <br />construction area. Placement and height will be determined by <br />a qualified wildlife biologist, but the height of the bat house <br />will be at least 15 feet. Bat houses will be multi -chambered <br />and will be purchased or constructed in accordance with CDFW <br />standards. The number of bat houses required will be <br />dependent upon the size and number of colonies found, but at <br />least one bat house will be installed for each pair of bats (if <br />occurring individually), or of sufficient number to <br />accommodate each colony of bats to be relocated. <br />MM BIO-1b: If construction activity associated with <br />Confirm pre -construction <br />Prior to construction <br />City of Santa Ana <br />development of the property is to occur during nesting bird <br />surveys for nesting birds <br />activities. <br />season (February 1 through August 31), a qualified biologist <br />were conducted. <br />shall conduct a pre -construction survey for nesting birds to <br />identify any potential nesting activity. The pre -construction <br />surveys for nesting birds shall be conducted within 14 days <br />prior to any construction -related activities (grading, ground <br />clearing, etc.). If nesting birds are identified on -site, a buffer <br />(e.g., 250 feet for raptors, 100 feet for native songbirds) shall <br />be maintained around the nests; no construction -related <br />activities shall be permitted within the buffer. A qualified <br />biologist shall monitor the nests, and construction activities <br />may commence within the buffer area at the discretion and in <br />the presence of the biological monitor. This mitigation measure <br />is not required if construction activities occur outside of the <br />nesting bird season (September 1 through January 31). <br />FirstCarbon Solutions <br />YI\PubllcalIoi(PN1N)\IXi2]\039PN1\MMRP\0iPOMl City of5anta Ana ]-Eleaen MMRP. doo- <br />
The URL can be used to link to this page
Your browser does not support the video tag.