Laserfiche WebLink
City of Santa Ana <br />7-Eleven Convenience Store and Service Station Project <br />Mitigation Monitoring and Reporting Program <br />Table 1 (cont.): 7-Eleven Convenience Store and Service Station Project Mitigation Monitoring and Reporting Program <br />Responsible for <br />Verification of Completion <br />Mitigation Measures <br />Method of Verification Timing of Verification <br />Verification <br />Date <br />Initial <br />construction area. Placement and height will be determined by <br />a qualified wildlife biologist, but the height of the bat house <br />will be at least 15 feet. Bat houses will be multi -chambered <br />and will be purchased or constructed in accordance with CDFW <br />standards. The number of bat houses required will be <br />dependent upon the size and number of colonies found, but at <br />least one bat house will be installed for each pair of bats (if <br />occurring individually), or of sufficient number to <br />accommodate each colony of bats to be relocated. <br />MM BIO-1b: If construction activity associated with <br />Confirm pre -construction <br />Prior to construction <br />City of Santa Ana <br />development of the property is to occur during nesting bird <br />surveys for nesting birds <br />activities. <br />season (February 1 through August 31), a qualified biologist <br />were conducted. <br />shall conduct a pre -construction survey for nesting birds to <br />identify any potential nesting activity. The pre -construction <br />surveys for nesting birds shall be conducted within 14 days <br />prior to any construction -related activities (grading, ground <br />clearing, etc.). If nesting birds are identified on -site, a buffer <br />(e.g., 250 feet for raptors, 100 feet for native songbirds) shall <br />be maintained around the nests; no construction -related <br />activities shall be permitted within the buffer. A qualified <br />biologist shall monitor the nests, and construction activities <br />may commence within the buffer area at the discretion and in <br />the presence of the biological monitor. This mitigation measure <br />is not required if construction activities occur outside of the <br />nesting bird season (September 1 through January 31). <br />FirstCarbon Solutions <br />YI\PubllcalIoi(PN1N)\IXi2]\039PN1\MMRP\0iPOMl City of5anta Ana ]-Eleaen MMRP. doo- <br />