City of Santa Ana
<br />Page 4
<br />REBID: Project 17-6801 CIVIC CENTER BIKE BLVD & Project 17-6886 SEPULVEDA SAFE ROUTES TO SCHOOL Printed 08/072019
<br />Bid Results
<br />Type
<br />Item Code
<br />U0M
<br />0ty
<br />Unit Price
<br />Una Total Comment
<br />35
<br />Type E Traffic Loop Detector
<br />EA
<br />50
<br />$270.00
<br />$13,500.00
<br />36
<br />Type D TrafBc Loop Detector
<br />......_..w„__.....,....__,,....._...._
<br />EA
<br />..:......... ....._....
<br />16
<br />........ .... ....
<br />$300.00
<br />,.... .....,.,_._._....-----
<br />$4,800.00
<br />37
<br />Fusion Splice 1 Strand SMFO
<br />.,_,._...._......... .,.-._..__..,_..___.�._.....,__
<br />L8
<br />12
<br />$44.00
<br />$628,00
<br />38
<br />IP Communication System at Civic Center Dr and Main St
<br />LS
<br />1
<br />$7,800.00
<br />$7,800.00
<br />39
<br />Temporary Overhead Wiring at Civic Center Dr and
<br />Main St
<br />LS
<br />1
<br />$11,000.00
<br />$11,000.00
<br />40
<br />Signing and Striping (Project 17-6801)
<br />.__. _... ..._. __.._.,-.___.
<br />LS
<br />,,.,,........ .._._-_..._...........__.._..
<br />1
<br />$160,000.00
<br />............._......_...__..._.........._.._......._..__.._.___�.,.._.-........,....
<br />$160,000.00
<br />41
<br />Signing and Striping (Project 17-6886)
<br />._...,....,_...__._._.._........_�....,........,_._„..____...-....._..,......._,_........_.._....._..,:.__.,......_..._.
<br />LS
<br />1
<br />$9.000.00
<br />$9,Oo0.00
<br />42
<br />Project Advertisement Sign
<br />ign
<br />.._._._..______.. _....
<br />_.._
<br />EA
<br />...... ........
<br />2
<br />__..._...........
<br />$1,000.00
<br />....._._.,_......._..._._..-.__...—
<br />$2,000.00
<br />43
<br />Relocate Rectangular Rapid Flashing Beacons
<br />-......,..
<br />EA
<br />1
<br />$2,000.00
<br />$2.000.00
<br />44-
<br />Remove Man Arm, Pole and Foundation
<br />EA
<br />1
<br />$6,000.00
<br />$6.000.00
<br />45
<br />Install Rectangular Rapid Flashing Beacons
<br />EA
<br />1
<br />$7,000,00
<br />$7,000.00
<br />46
<br />Labor Agreement Oversight
<br />...... _... ... ....... ..__...... _._.,,...__......._...
<br />LS
<br />...... .. ..
<br />1
<br />._,.:........ .,._,.
<br />$10,000.00
<br />..... .._...._.
<br />$10.000.00
<br />47
<br />Remove Interfacing AC Pipe and Replace vilth PVC Pipe complete in Place
<br />.... .. .. ..... .. ......... _. .,.. .
<br />LF
<br />60
<br />$200.00
<br />$12,000.00
<br />Subtotal
<br />$2,856,418.00
<br />ADD ALTERNATIVE ONE
<br />48
<br />Unclassified Excavation'
<br />CY
<br />110
<br />$150.00
<br />$16.600.00
<br />49
<br />AC Pavement*
<br />TN
<br />110
<br />$120.00
<br />$13,200.00
<br />PlanetBids, Inc.
<br />23A-12
<br />
|