Laserfiche WebLink
City of Santa Ana <br />Page 4 <br />REBID: Project 17-6801 CIVIC CENTER BIKE BLVD & Project 17-6886 SEPULVEDA SAFE ROUTES TO SCHOOL Printed 08/072019 <br />Bid Results <br />Type <br />Item Code <br />U0M <br />0ty <br />Unit Price <br />Una Total Comment <br />35 <br />Type E Traffic Loop Detector <br />EA <br />50 <br />$270.00 <br />$13,500.00 <br />36 <br />Type D TrafBc Loop Detector <br />......_..w„__.....,....__,,....._...._ <br />EA <br />..:......... ....._.... <br />16 <br />........ .... .... <br />$300.00 <br />,.... .....,.,_._._....----- <br />$4,800.00 <br />37 <br />Fusion Splice 1 Strand SMFO <br />.,_,._...._......... .,.-._..__..,_..___.�._.....,__ <br />L8 <br />12 <br />$44.00 <br />$628,00 <br />38 <br />IP Communication System at Civic Center Dr and Main St <br />LS <br />1 <br />$7,800.00 <br />$7,800.00 <br />39 <br />Temporary Overhead Wiring at Civic Center Dr and <br />Main St <br />LS <br />1 <br />$11,000.00 <br />$11,000.00 <br />40 <br />Signing and Striping (Project 17-6801) <br />.__. _... ..._. __.._.,-.___. <br />LS <br />,,.,,........ .._._-_..._...........__.._.. <br />1 <br />$160,000.00 <br />............._......_...__..._.........._.._......._..__.._.___�.,.._.-........,.... <br />$160,000.00 <br />41 <br />Signing and Striping (Project 17-6886) <br />._...,....,_...__._._.._........_�....,........,_._„..____...-....._..,......._,_........_.._....._..,:.__.,......_..._. <br />LS <br />1 <br />$9.000.00 <br />$9,Oo0.00 <br />42 <br />Project Advertisement Sign <br />ign <br />.._._._..______.. _.... <br />_.._ <br />EA <br />...... ........ <br />2 <br />__..._........... <br />$1,000.00 <br />....._._.,_......._..._._..-.__...— <br />$2,000.00 <br />43 <br />Relocate Rectangular Rapid Flashing Beacons <br />-......,.. <br />EA <br />1 <br />$2,000.00 <br />$2.000.00 <br />44- <br />Remove Man Arm, Pole and Foundation <br />EA <br />1 <br />$6,000.00 <br />$6.000.00 <br />45 <br />Install Rectangular Rapid Flashing Beacons <br />EA <br />1 <br />$7,000,00 <br />$7,000.00 <br />46 <br />Labor Agreement Oversight <br />...... _... ... ....... ..__...... _._.,,...__......._... <br />LS <br />...... .. .. <br />1 <br />._,.:........ .,._,. <br />$10,000.00 <br />..... .._...._. <br />$10.000.00 <br />47 <br />Remove Interfacing AC Pipe and Replace vilth PVC Pipe complete in Place <br />.... .. .. ..... .. ......... _. .,.. . <br />LF <br />60 <br />$200.00 <br />$12,000.00 <br />Subtotal <br />$2,856,418.00 <br />ADD ALTERNATIVE ONE <br />48 <br />Unclassified Excavation' <br />CY <br />110 <br />$150.00 <br />$16.600.00 <br />49 <br />AC Pavement* <br />TN <br />110 <br />$120.00 <br />$13,200.00 <br />PlanetBids, Inc. <br />23A-12 <br />