Laserfiche WebLink
City of Santa Ana <br />I <br />Page 6 <br />REBID: Project 17-6801 CIVIC CENTER BIKE BLVD & Project 17-8886 SEPULVEDA SAFE ROUTES TO SCHOOL <br />Printed 08107/2019 <br />Bid Results <br />i <br />Type <br />Item Code <br />110M <br />City <br />Unit Price <br />Llna Total Comment <br />50 <br />Construct PCC Sidewalk (T=4")" <br />_ <br />SF <br />1700 <br />$10.00 <br />$17.000.00 <br />51 <br />Construct PCC Curb Ramp* <br />I <br />SF <br />1500 <br />$15.00 <br />$22,500.00 <br />52 <br />Construct PCC Curb and Gutter (Type A-2.6)" <br />LF <br />300 <br />$39.00 <br />$11.700.00 <br />53 <br />Traffic Signal Moditication at Civic Center Or and <br />Sycamore St <br />LS <br />1 <br />$30.000.00 <br />$30,000.00 <br />54 <br />Install 2" PVC Conduit per plan <br />LF <br />110 <br />$40.00 <br />$4,400.00 <br />55 <br />Install 3" PVC Conduit per plan <br />LF <br />so <br />$50.00 <br />$2,500.00 <br />56 <br />Install No. 6 Pull Box" <br />EA <br />7 <br />$1,000.go <br />$7,000.00 <br />Subtotal <br />$124,800.00 <br />ADD ALTERNATIVE TWO <br />57 <br />Unclassl0ed Excavation' <br />CY <br />160 <br />$150.00 <br />$24.000.00 <br />58 <br />AC Pavement" <br />"" <br />TN <br />160 <br />$120.00 <br />$18.000.00 <br />59 <br />Construct PCC Sidewalk (T=,Vr <br />SF <br />3500 <br />$10.00 <br />$35,000.00 <br />60 <br />VConstruct PCC Curb Ramp' <br />SF <br />1B00 <br />$15.00 <br />$27,000.00 <br />61 <br />Construct PCC Curb and Gutter (Type A-2.6)• <br />LF <br />400 <br />$39.00 <br />$15,600.00 <br />62 <br />Traffic Signal Modification at Civic Center Dr and <br />Bush St <br />LS <br />1 <br />$30,000.00 <br />$30,000.00 <br />63 <br />Install 2" PVC Conduit per plan <br />LF <br />85 <br />$40.00 <br />$3,400.00 <br />64 <br />Install 3" PVC Conduit per plan <br />LF <br />25 <br />$50.00 <br />$1,250.00 <br />PlanetBlds, Inc. <br />23A-13 <br />