Laserfiche WebLink
CITY OF SANTA ANA <br />PROPOSAL REBID <br />PROJECT NO.: 17-6801 CIVIC CENTER BIKE BOULEVARD ATPL-5063(178) <br />PROJECT NO.: 17-6886 SAFE ROUTE TO SCHOOL ENHANCEMENTS FOR <br />SEPULVEDA ELEMENTARY SCHOOL ATPL-5063(174) <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Aramexx Group Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />I <br />Unclassified Excavation* <br />4,750 <br />CY <br />$ <br />S <br />\3O . oU <br />(ol�,Soo• <br />2 <br />AC Pavement* <br />4,850 <br />TN <br />S <br />S <br />tO4 o0 <br />504 4 00 <br />3 <br />Cold Milling* <br />3,200 <br />SF <br />S <br />$ <br />Z.Oo <br />lo�4Uo.o� <br />4 <br />Construct PCC Sidewalk (T=4")* <br />37,800 <br />SF <br />S <br />S <br />U-60 <br />?ILU. b00 <br />5 <br />Construct PCC Driveway (T=8")* <br />2,600 <br />SF <br />S <br />S <br />q. o0 <br />23,yOo <br />6 <br />Construct PCC Curb Ramp* <br />17,800 <br />SF <br />S <br />S <br />q.00 <br />\U017-00 <br />7 <br />Construct PCC Curb and Gutter <br />4,900 <br />LF <br />S <br />$ <br />(Type A-2-6)* <br />39 . OD <br />1kA - U OU <br />8 <br />Construct PCC Curb only (B-1)* <br />500 <br />LF <br />$ �� <br />� <br />$ <br />500 <br />.00 <br />q, <br />9 <br />Construct PCC Cross Gutter <br />7,000 <br />SF <br />S <br />S <br />(Local)* <br />I'2 . W <br />y , 00 o <br />10 <br />Construct Bus Pad(including <br />5,600 <br />SF <br />$ <br />$ <br />Rebar Dowels as -needed)* <br />23. Ob <br />t Llb , Q 00 <br />11 <br />Construct PCC Modified <br />880 <br />SF <br />S <br />S <br />Curb(Traffic Circle)* <br />1 <br />13.00 <br />20, zy 0 <br />12 <br />Construct Color Stamped Concrete <br />800 <br />SF <br />S <br />$ <br />including rebar (T=10")* <br />20 .00 <br />JU , 000 <br />13 <br />Root Shave <br />6 <br />EA <br />S <br />S <br />y0U <br />2,t_j0b <br />P-1 of P-19 <br />23A-15 <br />