My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ SAFE ROUTE TO SCHOOL
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
09/03/2019
>
23A - PROJ SAFE ROUTE TO SCHOOL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2019 1:21:06 PM
Creation date
8/30/2019 1:17:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
9/3/2019
Destruction Year
2024
Document Relationships
G.J. GENTRY GENERAL ENGINEERING, INC. (2)
(Amended By)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL REBID <br />PROJECT NO.: 17-6801 CIVIC CENTER BIKE BOULEVARD ATPL-5063(178) <br />PROJECT NO.: 17-6886 SAFE ROUTE TO SCHOOL ENHANCEMENTS FOR <br />SEPULVEDA ELEMENTARY SCHOOL ATPL-5063(174) <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />14 <br />Adjust Manhole Frame and Cover <br />9 <br />EA <br />S <br />S <br />to Grade <br />f I l bo <br />l4,40o <br />15 <br />Adjust Water Valve Frame and <br />27 <br />EA <br />$ <br />LIS O <br />$ <br />Cover to Grade <br />12 t S o <br />16 <br />Furnish and Install New Fire <br />4 <br />EA <br />$ <br />$ <br />Hydrant <br />I't.lot, o <br />�J4j000 <br />17 <br />Abandon Water Valve <br />4 <br />EA <br />S <br />$ <br />„son <br />Iy D6a <br />18 <br />Furnish and Install New Water <br />5 <br />EA <br />S <br />$ <br />Meter Box and Cover to Grade <br />sod <br />ZI SDp <br />19 <br />Remove Fire Hydrant and <br />4 <br />EA <br />S <br />$ <br />Assembly <br />$Po0 <br />70I ODD <br />20 <br />Furnish and Install Parkway <br />1 <br />EA <br />S <br />$ <br />Culvert <br />11,6D6 <br />I1+obb <br />21 <br />Construct Catch Basin (L=3.5', <br />1 <br />EA <br />S <br />S <br />V=2') including Local Depression <br />%6DD <br />91ce.0 <br />22 <br />Furnish and Install Reinforced <br />8 <br />LF <br />S <br />$ <br />Concrete Pipe (12" Diameter) <br />Zo D <br />s tboo <br />23 <br />Construct Concrete Collar <br />I <br />EA <br />S <br />S <br />9)bbb <br />L/ <br />24 <br />Irrigation <br />I <br />LS <br />S <br />$ <br />29110ob <br />ZVZ,DDD <br />25 <br />Landscaping <br />I <br />LS <br />$ <br />yl+Don <br />$ <br />th7000 <br />26 <br />60 Working Days Landscaping <br />1 <br />LS <br />S <br />S <br />Maintenance <br />(lcrpp <br />I19oo <br />27 <br />Traffic Signal Modification at <br />I <br />LS <br />$ <br />S <br />Civic Center Dr and Main St <br />Iz4 PDo <br />i-2�, bDb <br />28 <br />Video Detection System at Civic <br />1 <br />LS <br />S <br />S <br />L(S <br />Center Dr and Main St <br />IS,ODD <br />pD6 <br />29 <br />GTT Opticom EVP GPS System at <br />1 <br />LS <br />S <br />S <br />Civic Center Dr and Main St <br />( tn,pbD <br />I b,boo <br />30 <br />Install 2" PVC Conduit per plan <br />105 <br />LF <br />S <br />$ <br />3,Iso <br />31 <br />Install 3" PVC Conduit per plan <br />75 <br />LF <br />S <br />S <br />40,- <br />3,006 <br />32 <br />Install 4" PVC Conduit per plan <br />375 <br />LF <br />S <br />S <br />S°+" <br />18tZ5D <br />33 <br />Install No. 6 Pull Box <br />7 <br />EA <br />S <br />S <br />lop <br />Y,9oa <br />P-2 of P-19 <br />23A-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.