My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ SAFE ROUTE TO SCHOOL
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
09/03/2019
>
23A - PROJ SAFE ROUTE TO SCHOOL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/30/2019 1:21:06 PM
Creation date
8/30/2019 1:17:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
9/3/2019
Destruction Year
2024
Document Relationships
G.J. GENTRY GENERAL ENGINEERING, INC. (2)
(Amended By)
Path:
\Contracts / Agreements\ PROJECTS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
d1lS!/�IIGGIZ <br />ew:a»iowuemmemme. <br />532 W. First St. #202 <br />Claremont, CA 91711 <br />City of Santa Ana <br />Jerome Center Landscape Drainage — <br />Feb. 2019 — <br />20 Civic Center <br />Planting, PCC walkway, precast concrete, <br />April 2019 <br />Santa Ana, CA 92701 <br />irrigation. <br />Michael Ortiz <br />714-615-0892 <br />MOrtiz@santa-ana.org <br />City of Rialto <br />Renaissance Parkway Landscaping <br />Dec. 2018- <br />290 W. Rialto Ave. <br />Improvement — <br />April 2019 <br />Rialto, CA 92376 <br />Irrigation, planting, DG, installation of river <br />Kavous Emami <br />cobble with mortar and boulders. <br />909-628-6234 <br />kvaouse@kecengineers.com <br />City of Diamond Bar <br />City Entry Monuments— <br />Aug. 2018- <br />21810 Copley Drive <br />Grading, irrigation, planting, electrical. <br />Dec. 2018 <br />Diamond Bar, CA 91765 <br />Carl Sutherland <br />714-560-8680 <br />csutherland@tait.com <br />RSCCD Facility Planning <br />Water Conservation Irrigation Controller <br />Dec. 2018- <br />2323 North Broadway <br />Upgrade <br />Dec. 2018 <br />Suite 112 <br />Phase 2. - <br />Santa Ana, CA92706 <br />Investigate existing irrigation, install upgraded <br />irrigation. <br />City of Laguna Beach <br />Laguna Canyon Frontage Road Improvements— <br />Dec. 2018 — <br />479 Ocean Avenue <br />Clear and grub, grading, irrigation, planting. <br />Jan. 2019 <br />Laguna Beach, CA 92651 <br />Tri Nguyen <br />949-497-0741 <br />tnguyen(ED lagunabeachcity.net <br />County of Orange <br />Yorba Regional ADA Improvements —Construct <br />Sept. 2018 <br />OC Public Works <br />PCC walkways and picnic table pads, DG <br />— Nov. 2018 <br />300 N. Flower Street <br />paving, P.T.D.F header, detectable warning <br />Santa Ana, CA 92703 <br />systems, site furnishings, concrete transition <br />Nicholas Murray <br />patch, hydroblasting, concrete demo. <br />714-667-8800 <br />City of Brea <br />Brea Sports Park Landscape Improvements— <br />Sept. 2018 <br />One Civic Center Circle <br />Clear and grub, irrigation, planting, grading. <br />— Oct. 2018 <br />Brea, CA 92821 <br />Bill Bowlus <br />714-990-7694 <br />23A-31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.