Laserfiche WebLink
nrrs7rirc�rYir <br />532 W. First St. #202 <br />Claremont, CA 91711 <br />billb(-Ia citvofbrea.net <br />City of Claremont <br />Bollard Footing Installation Project — Saw <br />Sept. 2018 <br />207 Harvard Avenue <br />cutting asphalt, replacing asphalt sections with <br />— Oct. 2018 <br />Claremont, CA 91711 <br />removable concrete bollards. <br />Enrique Villalobos <br />909-399-5479 <br />evillalobos(apci.claremont.ca us <br />City of Buena Park <br />City Entry Sign on Beach Boulevard at the <br />July 2018 — <br />6650 Beach Boulevard <br />South City Limit — Clear and grub, sawcut and <br />Sept. 2018 <br />Buena Park, CA 90622 <br />remove curb and gutter, electrical system; <br />Ken Kim <br />pedestal with meter, lighting, conduit, <br />714-562-3688 <br />conductors, trenching, directional baring, 8" <br />kkim@buenaaark.com <br />curb and gutter, curb and gutter transition, AC <br />slot patch, remove and reconstruct concrete <br />sidewalk, grading, planting, irrigation, sign <br />monument, traffic control. <br />RSCCD Facility Planning <br />Water Conservation Irrigation Controller <br />May 2018- <br />2323 North Broadway <br />Upgrade- Investigate existing irrigation, install <br />June 2018 <br />Suite 112 <br />upgraded irrigation. <br />Santa Ana, CA92706 <br />City of Ontario <br />Trail and Concrete Mow Strip Installation — DG, <br />Jan. 2018— <br />Park and Maintenance Dept <br />concrete mow curb, grading, planting. <br />April 2018 <br />1425 South Bon View Avenue <br />Ontario, CA 91761 <br />Adrian Escamilla <br />909-395-2635 <br />City of Tustin <br />El Camino Real /Jamboree Road Median <br />Jan. 2018- <br />300 Centennial Way <br />Modifications and Striping Revisions —Traffic <br />Feb. 2018 <br />Tustin, CA 92780 <br />control, excavation, construct median curb, <br />Krys Saldivar <br />construct PCC mow strip, pavers, AC roadway <br />714-573-3172 <br />section, type E traffic loops. <br />ksald�nca.org <br />City of Bellflower <br />SR-91 Eastbound On and Off Ramp at <br />Jan. 2018- <br />16600 Civic Center Drive <br />Bellflower Phase 2 Landscape Improvements— <br />March 2018 <br />Bellflower, CA 90706 <br />traffic control, irrigation, planting. <br />Philip Wang <br />562-804-1424 ext.2254 <br />PWang(m bellflower. org <br />City of Orange <br />Katella Avenue Sidewalk Improvements — <br />Dec. 2017 — <br />300 W. Chapman Avenue <br />clearing and grubbing, traffic control, <br />Jan. 2018 <br />Orange, CA 92866-1591 <br />excavation, construct concrete sidewalk, <br />23A-32 <br />