Laserfiche WebLink
City of Santa Ana Annexation <br />Table 1.2: Estimated Study Area General Fund Net Annual Fiscal <br />Impact (2018 dollars)* <br />Cost/Revenue Description Estimated Value <br />Estimated Total Costs to the City General Fund** <br />Sources of Revenue <br />Property Tax <br />Property Tax In Lieu of VLF <br />Property Transfer Tax <br />Sales Tax <br />Measure X(2019-2029) <br />Other Revenue*** <br />Total Estimated General Fund Revi <br />Estimated Net Fiscal General Fund <br />from Annexation <br />$182,000 <br />$62,000 <br />$30,000 <br />$1,000 <br />$66,000 <br />$100,000 <br />$50,000 <br />Annexation $127,000 <br />"Numbers are rounded to the nearest $1,000 throughout and may not sum. <br />•• See Appendix Table D for General Fund cost breakdown and calculations. <br />"* See Appendix Table C for sources and calculations included in 'Other Revenue.' <br />Source: Orange County Treasurer -Tax Collector; City of Santa Ana, California Department of Finance; Costar; AECOM, <br />2018 <br />Costs to the General Fund were first estimated on a citywide per service population basis, which consists of all <br />residents and half of the employees. These were then adjusted to estimate the marginal and total costs of servicing <br />the total service population of the Study Area. Conservative marginal service cost assumptions based on general <br />fiscal impact practice are detailed in Appendix Table D. <br />Table 1.3: Estimated Study Area Road Fund Net Annual Fiscal Impact <br />(2018 dollars)* <br />Estimated <br />Cost/Revenue Description Value <br />Estimated Total Costs for Road Maintenance $110,000 <br />Road Fund Revenue Sources <br />HUTA** <br />$8,000 <br />RMRA <br />$5,000 <br />Measure M <br />$4,000 <br />Other*** <br />$400 <br />Total Estimated Revenue from Annexation $18,000 <br />Estimated Road Fund Net Fiscal Deficit from <br />Annexation-$92,000 <br />- Numbers are rounded throughout and may not sum. <br />--HUTA includes HUTA 2105, 2106, 2107, 2103 <br />•-*Other includes SBl Loan Repayment and Engineering Cost Allocation <br />Source: City of Santa Ana Adopted Budget 2018-19, AECOM 2018 <br />75C-132 <br />AECOM <br />