Laserfiche WebLink
USE TAX <br />OFPLINE TRANSPORTATION <br />275 <br />13,275 <br />1,929 <br />TOTAL MATERIAL COST <br />xx <br />169,526 169,526 <br />OTHER <br />AC POWER SERVICE <br />1.0 EA N <br />5,000 <br />BUNGALOW, WIRE AND TEST <br />1.0 LS N <br />4,418 <br />CONTRACT ENGINEERING <br />1.0 LS N <br />8,000 <br />DIRECTIONAL BORING <br />300.0 FT N <br />15 nnn <br />TOTAL OTHER ITEMS COST <br />32,418 32,418 <br />PROJECT SUBTOTAL <br />CONTINGENCIES <br />294,000 <br />BILL PREPARATION FEE <br />0 <br />2,940 <br />GROSS PROJECT COST <br />LESS COST PAID By BNSF <br />296,940 <br />0 <br />TOTAL BILLABLE COST <br />296,940 <br />Page 5 of 5 <br />