My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA - SAN LORENZO
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/01/2019
>
20A - AA - SAN LORENZO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 7:45:57 PM
Creation date
9/27/2019 4:09:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20A
Date
10/1/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUTEER <br />Conslrvellon Idonapere, famsr(m,p Cnglnaort <br />Mark M. Butier, Jr. <br />Project Director <br />Professional Summary <br />EDUCATION <br />Mr. Butler serves as Vice -President and Chief Financial Officer for Butler <br />MBA, Finance, university of <br />Engineering. His primary duties include functioning as the primary point of <br />California, Irvine, Graduate <br />contact between Butlerand its clients; contract management; sub -consultant <br />School of Management, <br />contract management; maintenance of Butler's project Information system; <br />1998 <br />development of thefirm's field procedural manuals; and staff resource <br />Graduate Studies, Civil <br />management. Mr. Butler works closely with the field construction management <br />Engineering, Callomla state <br />staff to ensure all contract scope requirements are being fully Implemented. Mr. <br />University at Long Beach <br />Butler also serves as the firm's contact between the field construction <br />management stafflclient and the project public outreach effort, when necessary. <br />B.A., Economics, University <br />He has been responsible for generating, distributing, and presenting to <br />of southern California, 1987 <br />numerous public boards and community associations dealing with the impact of <br />B.A., social Sciences, <br />construction activity on the local community. <br />University of Southern <br />Project Experience <br />California, 1987 <br />Project Director, Mid -Basin Injection: Centennial Park Project; Santa <br />LICENSES I <br />Ana, CA; Orange County Water District (Est. Completion: 2018)—The <br />CERTIFICATIONS <br />Mid -Basin Injection project consists of the construction of the following: four <br />General Engineering <br />groundwater injection wells in below grade vaults; a monitoring well at the <br />Contractor, state of <br />Heritage Museum site; a purified recycled water injection supply pipeline <br />California, Class A 716863 <br />approximately 5,000 feet long that connects to the District's existing <br />Registered Construction <br />Groundwater Replenishment System (GWRS) pipeline and crosses the Santa <br />Inspector, ACIA: Division I <br />Ana River; a backflush discharge pipeline approximately 4,000 feet long that <br />Engineering 5572 <br />discharges to the Greenville -Banning Channel and Centennial Park Lake; <br />installation of submersible pumps within the four injection wells; replacement <br />YEARS WITH FIRM <br />of approximately 9.6 acres of paving within the Park; demolishing an existing <br />31 yea rs <br />City of Santa Ana restroom facility; and constructing two new buildings with <br />shared City and District uses. Butler is coordinating closely with the City of <br />AVAILABILITY <br />Santa Ana, Santa Ana Unified School District, Heritage Museum, and <br />As-NGeded <br />state and federal agencies, <br />Project Director, Edinger Avenue Well —Phase 11 Equipping Project; City <br />of Tustin, Public Works (Estimated Completion: 2016; Value: <br />$4,103,650)—Butier is providing construction management and inspection <br />services for the Edinger Avenue Well - Phase II Equipping Project. <br />Construction of the building and equipping of the pump includes installation of <br />a 225 LF of 12-inch diameter CML ductile iron pipe discharge water line; <br />connection to 12-inch ductile iron watermain; installation of 162 LF of 18-inch <br />diameter C-905 drain line; connection to the existing storm drain; placement <br />of new onsite sewer manhole; installation of 76 LF of 8-inch diameter SDR 26 <br />sewer lateral; and connection to existing OCSD sewer manhole. The scope of <br />nrork also includes the erection of 2.376 SF of CII block wall with a metal <br />roof building to enclose the well pump, electrical equipment and chlorine <br />room. The project is part of the City of Tustin's Water Services Division, <br />which is responsible for the production and safe delivery of domestic water to <br />more than 14,100 service connections through approximately 172 miles of <br />water mains. Butler staff coordinated with several agencies including the City <br />of Tustin, City of Santa Ana, and Caltrans, <br />KO -• <br />
The URL can be used to link to this page
Your browser does not support the video tag.