My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20A - AA - SAN LORENZO
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/01/2019
>
20A - AA - SAN LORENZO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 7:45:57 PM
Creation date
9/27/2019 4:09:05 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20A
Date
10/1/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUTLER <br />� uno7rnn Munepere, Cnnrufni¢,Enyfnnors <br />Mark M. Butler, Jr. <br />Project Director <br />Owner's Representative, Agua Hedionda Sewer Lift Station and <br />VistalCarlsbad Interceptor Sewer Replacement; Vista, CA; Cities of <br />Vista and Carlsbad (Completion: 2018; Value $64.2 million)•—Butier is <br />performing as the Owner's Representative for the construction of the sewer <br />lift station and interceptor sewer reaches. The project begins at the north <br />shore of the Agua Hedionda Lagoon in Carlsbad and extends a distance of <br />2.3 miles to the Encina Water Pollution Control Facility. Major project <br />components include the following: 1) Removal and replacement of the <br />existing wood trestle sewer support bridge across the lagoon with a new steel <br />support bridge. The existing 42-inch diameter sewer pipe along the bridge will <br />be replaced with a new 54-Inch pipe; 2) Removal and replacement of the <br />existing Ague Hedionda lift station. The new structure will house replacement <br />motors and pumps, as well as new system enhancements including an <br />emergency generator and bypass motors and pumps, an electrical control <br />building, and odor control facilities; and 3) Construction of a new 30-inch <br />diameter force main and a new 54-inch diameter gravity sewer line to <br />increase system capacity and reliability. The force main will provide 4,000 <br />linear feet of high density polyethylene pipe parallel to an existing line and will <br />connect into 7,000 linear feet of new 54-inch diameter gravity sewer to be <br />constructed in Avenida Encinas from Cannon Road to the Encina Water <br />Pollution Control Facility. <br />Project Director, Orange County Groundwater Storage Program; Orange <br />County, CA (Orange County Water District) —The Orange County <br />Groundwater Storage Program consisted of equipping eight (8) municipal <br />water production wells in the cities of Santa Ana, Anaheim, Garden <br />Grove, Westminster, Cypress, Placentia, and Buena Park, The scope of work <br />for the wells included site work; installation of deep well turbine pump and <br />motors, electrical and instrumentation work, disinfection facilities, discharge <br />piping and valving, and off -site piping and valving, construction of concrete <br />block buildings, paving, drainage, fencing, and landscaping; and startup, <br />testing, and training. Mr. White coordinated with building officials, City <br />engineers, and public works departments to learn the organization's <br />operation, discover the hierarchy, and present solutions tailored to each of <br />the agency's needs. <br />Project Director, Burris Pump Station Project —Phase 2; Anaheim, CA; <br />Orange County Water District (Completion: 2016; Value: $20,585,400}-- <br />Mr. Butler oversaw the construction management and inspection services <br />team for the Burris Pump Station Project — Phase 2, Phase 1 included the <br />construction of a portion of the building site and an earthen berm. The berm <br />allows the basin to remain in operation during final construction of the wet <br />well and pump station. Phase 2 consisted of the construction of a new 10,000 <br />SF storm water pump station that uses four conventional vertical turbine <br />pumps installed in a circular wet well. The pump station also consists of new <br />mechanical, electrical, and control systems. An intake pipe was installed on <br />the slope of the embankment, connecting the new pumps to the intake invert. <br />20A-49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.