<br />Traffic Signal References
<br />County of Los Angeles Department of Public Works
<br />Aviation Blvd 111811 Street/Northrup Grumman Avenue to Ocean Drive #TSM0010190
<br />Original Contract Amount: $1,352,897.25
<br />Final Contract Amount: $1,415,076.67
<br />Contact: Fred Kheradvar
<br />Main: 626,458.3199
<br />Email: fkheradv@dpw.lacounty.gov
<br />Approximate StarUEnd Dates: September 2016 —April 2018
<br />Brief Description of Work: Traffic Signal Installation/Modifications at multiple intersections along Aviation Blvd including new traffic signal
<br />poles and vehicular/pedestrian traffic gear, new controller cabinets with new foundations, new service pedestals with new foundations,
<br />battery backup installation, video detection system installation. safety lighting installation, emergency vehicle preemption installation. new
<br />ada compliant curb ramps, new striping and markings, loop detection systems, new underground conduit and pullbox installation. SCE
<br />underground substructures, concretelasphalt improvements, etc.
<br />County of Los Angeles Department of Public Works
<br />Florence Avenue/Mills Avenue I Orr and Day Road to Whittier Boulevard #TSM0010312
<br />Original Contract Amount: $981,099.00
<br />Final Contract Amount $1,039,990,01
<br />Contact Anoush Hovsepians
<br />Main: 626.458.3139
<br />Email ahovsepians@dpw.lacounty.gov
<br />Approximate Start/End Dates: August 2017 — September 2018
<br />Brief Description of Work: Traffic Signal InstallationlModifications at multiple intersections along Florence Avenue including new traffic
<br />signal poles and vehicular/pedestrian traffic gear, new controller cabinets with new foundations, new service pedestals with new
<br />foundations, battery backup installation, video detection system installation. safety lighting installation. emergency vehicle preemption
<br />installation, new ada compliant curb ramps, new striping and markings, loop detection systems, new underground conduit and pullbox
<br />installation, SCE underground substructures, concretelasphalt improvements, etc.
<br />County of Los Angeles Department of Public Works
<br />Colima Road I Camino Del Sur to East of Tierra Luna (Pedestrian Crossing) #TSM0010196
<br />Original Contract Amount: S1,746,742.55
<br />Final Contract Amount: $1,816,477.16
<br />Contact: Joel Zaragoza
<br />Main: 626,458.4973
<br />Email: JZARA@dpw.lacounty.gov
<br />Approximate Start/End Dates: January 2017 — October 2018
<br />Brief Description of Work: Traffic Signal Installation/Modifications at multiple intersections along Colima Road including new traffic signal
<br />poles and vehicular/pedestrian traffic gear, new controller cabinets with new foundations, new service pedestals with new foundations,
<br />battery backup installation, video detection system installation, safety lighting installation, emergency vehicle preemption installation, new
<br />ada compliant curb ramps, new striping and markings, loop detection systems, new underground conduit and pullbox installation, SCE
<br />underground substructures, SCE underground substructures, concretelasphalt improvements. etc.
<br />County of Los Angeles Department of Public Works
<br />Florence -Firestone Community Safe Routes to School # R000016046
<br />Original Contract Amount: $708,395,78
<br />Final Contract Amount: $733,074.89
<br />Contact: Robert Eisenhamer
<br />Main: 626,458,3155
<br />Email: REISENHA@dpw.lacounty.gov
<br />929 Otterbeirn Avenue, Unit E. La Puente. CA 91748 I Ph'. i62M 810-1338 Fax: (626) 810-1322 1 Email: estimating&pengineeringinc.com