Laserfiche WebLink
January 17, 2019 <br />Page 1 <br />Approximate Start/End Dates: October 2017 — March 2018 <br />Brief Description of Work: Traffic Signal Installation/Modifications at multiple intersections including new traffic signal poles and <br />vehiculadpedestrian traffic gear, new controller cabinets with new foundations, new service pedestals with new foundations, battery <br />backup installation, video detection system installation. safety lighting installation, emergency vehicle preemption installation, new ada <br />compliant curb ramps, new striping and markings, loop detection systems, new underground conduit and pullbox installation. SCE <br />underground substructures, concretelasphaltimpovements. etc. <br />City of Orange <br />Left Turn Phasing Signal Modification I Chapman Avenue & Cannon Street #HSIPL 5073(079) SP-3868 <br />Left Turn Phasing Signal Modification I Batavia Street & Collins Avenue #HSIPL 5073(081) SP•3870 <br />Original Contract Amount: $599,999.00 <br />Final Contract Amount: $608,424.00 <br />Contact: Medel Llanes <br />Main: 714.744,5535 <br />Email: mllanes@cityoforange.org <br />Approximate Start/End Dates: April 2018 — October 2018 <br />Brief Description of Work: Traffic Signal InstallationlModifications including new traffic signal poles and vehicular/pedestrian traffic gear, <br />new controller cabinets with new foundations, new service pedestals with new foundations, battery backup installation, video detection <br />system installation, safety lighting installation, emergency vehicle preemption installation, new ada compliant curb ramps, new striping <br />and markings. loop detection systems. CCTV, new underground conduit and pullbox installation. SCE underground substructures, <br />concretelaspha# improvements, etc. <br />City of Orange <br />Tustin Street and Vanowen Avenue Traffic Signal Modification #SP-3927 <br />Original Contract Amount: $355,156,00 <br />Final Contract Amount: $386,200.60 <br />Contact: Medel Llanes <br />Main: 714.744.5535 <br />Email: mllanes@cityoforange.org <br />Approximate Start/End Dates. August 2016 — October 2016 <br />Brief Description of Work: Traffic Signal InstallationlModifications including new traffic signal poles and vehiculadpedestrian traffic gear, <br />new controller cabinets with new foundations, new service pedestals with new foundations, battery backup installation, video detection <br />system installation, safety lighting installation, emergency vehicle preemption installation, new ada compliant curb ramps, new striping <br />and markings, loop detection systems. CCTV, new underground conduit and pullbox installation. SCE underground substructures, <br />concretelasphalt improvements, etc. <br />City of Santa An <br />Traffic Signal Modifications on: <br />17t" Street at English Street I MacArthur Boulevard at Plaza Drive #15.6834 <br />Edinger Avenue at Sullivan Street I Westminster Avenue at Clinton Street #15.6834 <br />Original Contract Amount: $865,319.00 <br />Final Contract Amount. $872.755.00 <br />Contact: Michael Ortiz <br />Main: 714.647,5624 <br />Email, MOrtiz@santa-ana.org <br />Approximate Start%End Dates: January 2017 — December 2017 <br />Brief Description of Work: Traffic Signal Installation.%Modifications at various intersections including new traffic signal poles and <br />vehiculadpedestrian traffic gear, new controller cabinets with new foundations, new service pedestals with new foundations, battery <br />backup installation video detection system installation safety lighting installation. emergency vehicle preemption installation, new ada <br />compliant curb ramps, new striping and markings. CCTV loop detection systems, new underground conduit and pullbox installation. SCE <br />underground substructures. concrete/asphalt improvements, etc. <br />City of Santa Ana <br />Safe Routes to School Enhancements for Heninger Elementary #16.6870 <br />Original Contract Amount: $417,341.50 <br />20C-25 <br />