My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
20C - AA - STREET LIGHT MAINT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/01/2019
>
20C - AA - STREET LIGHT MAINT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 7:46:41 PM
Creation date
9/27/2019 4:09:08 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
20C
Date
10/1/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
✓anuaiy, 17, 2019 <br />Page <br />Original Contract Amount: $462.027,50 <br />Final Contract Amount $466.397.80 <br />Contact Joe Catalan <br />Main: 661.326,3597 <br />Email: jcatalan@bakersfieldcity us <br />Approximate Start/End Dates: June 2016 — October 2016 <br />Brief Description of Work: Instaflabon of conduit, fiber optic cable, models networking equipment, other fiber optic equipment, and surge <br />suppression of equipment along Stockdate Highway from .Allen Road to Coffee Road. <br />Riverside County Transportation Department <br />Pourroy Road Traffic Signal and Safety Lighting Project I French Valley Area #C8.0067 <br />Weirick Road Restriping and Signal Modification Project I Temescal Valley Area #C8.0076 <br />Original Contract Amount: $458,048.00 <br />Final Contract Amount: $458.048.00 <br />Contact: Ivan Mendoza <br />Main: 562.254.9351 <br />Email: ivanmmendoza@aol.com <br />Approximate Start/End Dates: August 2018 — October 2018 <br />Brief Description of Work: Traffic Signal InstallationiModifications including new traffic signal poles and vehiculadpedestrian traffic gear, <br />new controller cabinets with new foundations, new service pedestals with new foundations, battery backup installation. video detection <br />system installation, safety lighting installation, emergency vehicle preemption installation, new able compliant curb ramps, new striping <br />and markings, loop detection systems, new underground conduit and pullbox installation. SCE underground substructures, <br />concrete/asphalt improvements.. etc. <br />document last modified 11,20 2018 <br />20C-27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.