Laserfiche WebLink
January 17, 2019 <br />Page 3 <br />Final Contract Amount S429.508.89 <br />Contact: Michael Ortiz <br />Main: 714.647.5624 <br />Email: MOrtiz@santa-ana.org <br />Approximate Start/End Dates: January 2017 — December 2017 <br />Brief Description of Work: Traffic Signal InstallationiModifications at Heninger Elementary including new traffic signal poles and <br />vehicular/pedestrian traffic gear. new controller cabinets with new foundations, new service pedestals with new foundations. battery <br />backup installation, video detection system installation, safety lighting installation, emergency vehicle preemption installation, new ada <br />compliant curb ramps. new striping and markings. loop detection systems. new underground conduit and pullbox installation, SCE <br />underground substructures, concrete/asphalt improvements. etc. <br />City of Westminster <br />Traffic Signal Modifications Various Locations (4Intersections) #2373 <br />Original Contract Amount $525,438.00 <br />Final Contract Amount: $543.508,69 <br />Contact, Bill Pham <br />Main: 714.548.3457 <br />Email hpham@westminster-ca.gov <br />Approximate StartfEnd Dates: May 2017 — November 2017 <br />Brief Description of Work: Traffic Signal InstallationlModifications at various intersections including new traffic signal poles and <br />vehicular/pedestrian traffic gear, new controller cabinets with new foundations, new service pedestals with new foundations, battery <br />backup installation. video detection system installation, safety lighting installation, emergency vehicle preemption installation, new ada <br />compliant curb ramps. new striping and markings, loop detection systems, new underground conduit and pullbox installation, SCE <br />underground substructures. concrete/asphalt improvements. etc. <br />City of Burbank <br />Safe Routes to School Cycle 8 Project #1378 <br />Original Contract Amount $865,319.00 <br />Final Contract Amount: $941,321.69 <br />Contact: Jonathan Yee <br />Main: 818.238,3969 <br />Email jyee@burbankca.gov <br />Approximate StarUEnd Dates: June 2016 — October 2016 <br />Brief Description of Work Traffic Signal InstallationlModifications at various intersections includng new traffic signal poles and <br />vehiculadpedestrian traffic gear, new controller cabinets with new foundations, new service pedestals with new foundationsbattery <br />backup installation, video detection system installation, safety lighting installation, emergency vehicle preemption installation, new ada <br />compliant curb ramps, new striping and markings, loop detection systems. new underground conduit and pullbox installation. SCE <br />underground substructures. concretelasphalt improvements. etc. <br />City of Ceres <br />Traffic Signal Interconnect Part 14 <br />Original Contract Amount. $312,862.50 <br />Final Contract Amount: 5339.226.87 <br />Contact: Samir,Royal <br />Main: 209,538.5617 <br />Email, Samir.royal@ci.ceres.ca.us <br />Approximate Start/End Dates. July 2017 — October 2017 <br />Brief Description of Work. Traffic Signal Installation/Modifications at various intersections including vehicular pedestran traffic gear, new <br />controller cabinets with new foundations new service pedestals with new foundations, battery backup installation, video detection system <br />installation. safety lighting installation emergency vehicle preemption installation, loop detection systems, new underground conduit and <br />pullbox installation. SCE underground substructures concrete/asphalt improvements. etc. <br />City of Bakersfield <br />Traffic Signal Interconnect Part 14 <br />20C-26 <br />