My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ CENTENNIAL PARK WALKWAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/15/2019
>
23A - PROJ CENTENNIAL PARK WALKWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 5:12:40 PM
Creation date
10/10/2019 4:55:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
10/15/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />CENTENNIAL PARK IMPROVEMENTS: <br />PROJECT NO. 18-7929: CENTENNIAL PARK WALKWAY IMPROVEMENTS <br />PROJECT NO. 18-7528: CENTENNIAL PARK LIGHTING IMPROVEMENTS <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />11 <br />Decomposed Granite <br />170 <br />Cy <br />$150.00 <br />$ 25,500,00 <br />12 <br />PCC Curb (Type B-1 with 8" curb face) <br />3,100 <br />LF <br />$40,00 <br />$ 124,000.00 <br />13 <br />PCC Curb (Type B-1 with 0" face) <br />90 <br />LF <br />$ 40.00 <br />$ 3,600.00 <br />14 <br />Lake Edge Slope Improvements <br />1 <br />LS <br />$5,000.00 <br />$ 5,000.00 <br />15 <br />Jetty improvements <br />I <br />LS <br />$10,000.00 <br />$ 10,000.00 <br />16 <br />ADA Ramp/Walkway Improvements <br />1 <br />LS <br />$120,000.00 <br />$ 120,000.00 <br />17 <br />Identification Signs <br />9 <br />EA <br />$1,000.00 <br />$ 9,000.00 <br />18 <br />Slurry Seal <br />190,000 <br />SF <br />$0.50 <br />$ 95,000.00 <br />19 <br />New Lighting at Centennial Park <br />1 <br />LS <br />$325,000-00 <br />$ 325,000.00 <br />20 <br />Additional Light Pole <br />5 <br />EA <br />$4,000.00 <br />$ 20,000.00 <br />21 <br />Additional Light Pole Assembly <br />5 <br />EA <br />$3,000.00 <br />$15,000.00 <br />22 <br />Additional Wiring <br />300 <br />LF <br />$25.00 <br />$ 7,500.00 <br />23 <br />Additional Conduit <br />300 <br />LF <br />$80.00 <br />$ 24,000.00 <br />24 <br />Signingand Striping <br />I <br />LS <br />$48,000.00 <br />$48,000.00 <br />25 <br />Traffic Control <br />1 <br />LS <br />$16,000.00 <br />$ <br />16,000.00 <br />26 <br />BMPs and Erosion Control Measures <br />I <br />LS <br />$15,000.00 <br />$ 15,000.00 <br />2J/�►f 1� <br />
The URL can be used to link to this page
Your browser does not support the video tag.