My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ CENTENNIAL PARK WALKWAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/15/2019
>
23A - PROJ CENTENNIAL PARK WALKWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 5:12:40 PM
Creation date
10/10/2019 4:55:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
10/15/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />CENTENNIAL PARK IMPROVEMENTS: <br />PROJECT NO. 18-7929: CENTENNIAL PARK WALKWAY IMPROVEMENTS <br />PROJECT NO. 18-7529: CENTENNIAL PARK LIGHTING IMPROVEMENTS <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Leonida Builders, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Description <br />Qty <br />Unit <br />Unit Price <br />Amount <br />I <br />Mobilization/Demobilization <br />I <br />LS <br />$ 55,000.00 <br />$ 55,000.00 <br />- <br />Demolition of existing structures, <br />bollards, guardrails and ramps <br />LS <br />$ 30,000.00 <br />$ 30,000.00 <br />3 <br />Remove and Dispose PCC sidewalks, <br />PCC slabs, and brick pavers <br />31,400 <br />SF <br />$ 3.00 <br />$ 94,200,00 <br />4 <br />Remove and Dispose Signs <br />6 <br />EA <br />$ 500.00 <br />$ 3,000.00 <br />5 <br />Remove and Dispose Trees <br />2 <br />EA <br />$2,000.00 <br />$ 4,000,00 <br />6 <br />Precast Concrete Bollards <br />63 <br />EA <br />$450.00 <br />$ 28350.00 <br />7 <br />Existing Guardrail Improvements <br />I <br />LS <br />$ 35,000.00 <br />$ 35,000.00 <br />8 <br />PCC Sidewalk/Slabs (T=4") <br />14,400 <br />SF <br />$12 00 <br />$ 172,800.00 <br />9 <br />PCC Access Ramp (Type 1) <br />550 <br />SF <br />$ 18.00 <br />$ <br />9,900.00 <br />10 <br />Brick Pavers <br />4,100 <br />SF <br />$ 30.00 <br />$ 123,000.00 <br />21A W <br />
The URL can be used to link to this page
Your browser does not support the video tag.