Laserfiche WebLink
Amend FY 19-20 CIP and Award Contract to Leonida Builder, Inc., <br />Centennial Park Walkway and Lighting Improvements Project <br />October 15, 2019 <br />Page 2 <br />The scope of work includes the removal and replacement of failed walkways, concrete slabs, curbs, <br />and brick pavers; removal of deteriorated wooden light poles; and construction of new concrete <br />light pole assemblies with energy efficient LED fixtures, foundation, electrical conduit, and wiring. <br />In addition, the work includes demolition of existing structures, signs and trees; construction of new <br />bollards, guardrails, new decomposed granite walkways, river rock slope protection, Americans <br />with Disabilities Act (ADA) access ramps; identification signs; slurry seal and restriping of parking <br />lots. The project is expected to start in approximately November of 2019. Once the project is <br />completed, these walkway and lighting improvements will enhance safety, reduce energy <br />consumption, enrich the visual appearance of the community area, and park lighting will be <br />improved and modernized. <br />Public Outreach and Contractor Participation <br />To provide an opportunity for local vendors to submit bids, a Notice Inviting Bids was advertised in <br />the Orange County Register on August 2 and 7, 2019, and bids were received electronically via <br />the City's web -based electronic bidding system, PlanetBids, on August 28, 2019. Through the <br />PlanetBids online portal, vendors may register to receive notifications on all current and future City <br />projects, as well as download contract documents, receive project updates, and submit bids <br />electronically. <br />A total of 63 vendors, were notified of the project via PlanetBids. 57 vendors requested bidding <br />documents and 6 bids were received with no bids received from Santa Ana contractors. <br />Bid Results Summary <br />RANK <br />BIDDER'S NAME <br />LOCATION <br />BASE BID <br />1 <br />Leonida Builders, Inc. <br />Santa Clarita <br />$1,427,850 <br />2 <br />Alfaro Communications Construction, Inc. <br />Compton <br />$1,430,877 <br />3 <br />Vido Samarzich, Inc. <br />Rancho Cucamonga <br />$1,478,950 <br />4 <br />EBS GENERAL ENGINEERING INC <br />Corona <br />$1,557,659 <br />5 <br />Western Construction Specialists inc. <br />Santa Fe Springs <br />$1,599,915 <br />6 <br />YAKAR <br />Covina <br />$1,958,790 <br />All 6 bids received were deemed responsive. Leonida Builders, Inc., submitted the lowest <br />responsive bid in the amount of $1,427,850 (Exhibit 2). Based on the bid analysis and a <br />contractor's reference check, staff recommends awarding the construction contract (Exhibit 3) to <br />Leonida Builders, Inc., in the amount bid. <br />'When this project was advertised, the Centennial Park Walkway project number was erroneously <br />stated as 18-7929." In order to be consistent with internal fiscal controls, all future references will <br />be corrected to "18-7529." <br />23A-2 <br />