My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ CENTENNIAL PARK WALKWAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/15/2019
>
23A - PROJ CENTENNIAL PARK WALKWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 5:12:40 PM
Creation date
10/10/2019 4:55:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
10/15/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Page 3 <br />Centennial <br />Park Walkway Improvements & Centennial <br />Park Lighting Improvements (18-7929 & 18-7528), bidding <br />on Printed 09/12/2019 <br />Bad Results <br />Type <br />Item Code <br />UOM <br />city <br />Unit Price <br />Line Total Comment <br />19 <br />New Lighting at Centennial Park <br />LS <br />1 <br />$325,000.00 <br />$325,000.00 <br />20 <br />Additional Light Pole <br />EA <br />5 <br />$4,000.00 <br />$20,000.00 <br />21 <br />Additional Light Pole Assembly <br />EA <br />5 <br />$3,000.00 <br />$15,000.00 <br />22 <br />Additional Wiring <br />LF <br />300 <br />$25.00 <br />$7,500.00 <br />23 <br />Additional Conduit <br />LF <br />300 <br />$80.00 <br />$24,000.00 <br />24 <br />Signing and Striping <br />LS <br />1 <br />$48,000.00 <br />$48,000.00 <br />25 <br />Traffic Control <br />LS <br />1 <br />$16,000.00 <br />$16,000.00 <br />26 <br />BMPs and Erosion Control Measures <br />LS <br />1 <br />$15,000.00 <br />$15,000.00 <br />27 <br />Labor Agreement Oversight <br />LS <br />1 <br />$10,000.00 <br />$10,000.00 <br />- <br />Subtotal <br />$1,427,850.00 <br />Asterisk Notes (per P-3 of P-17 of Specifications) - NOT part of Total Bid Calculation <br />28 <br />`= Mobilization/Demobilization bid item is limited <br />to a maximum <br />of 5% of the Total Bid <br />ea <br />0 <br />0 <br />0 <br />Subtotal <br />0 <br />Total <br />$1,427,850.00 <br />PlanetBids, Inc. <br />23A-8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.