My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ CENTENNIAL PARK WALKWAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/15/2019
>
23A - PROJ CENTENNIAL PARK WALKWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 5:12:40 PM
Creation date
10/10/2019 4:55:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
10/15/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/28/2019 <br />beta.SAM.gov <br />Rotary scarifier or multiple head concrete chipping <br />scarifier; Steel headerboard and guideline setter; Tamper, <br />Barka, Wacker and similar type; Trenching machine, <br />hand -propelled <br />GROUP 4: Any worker exposed to raw sewage; Asphalt raker, <br />lute person, ironer, asphalt dump person and asphalt <br />spreader boxes (all types); Concrete care cutter (walls, <br />floors or ceilings), grinder or sander; Concrete saw <br />person, cutting walls or flat work, scoring old or new <br />concrete; Cribber, shorer, lagging, sheeting and trench <br />bracing, hand -guided lagging hammer; Head rock Slinger; <br />Laborer, asphalt -rubber distributor boot person; Laser beam <br />in connection with laborers' work; Over -size concrete <br />vibrator operator, 70 lbs. and over; Pipelayer performing <br />all services in the laying and installation of pipe from <br />the point of receiving pipe in theditch until completion of <br />operation, including any and all forms of tubular material, <br />whether pipe, metallic or non-metallic,conduit and any <br />other stationary type of tubular device used for the <br />conveying of any substance or element, whether, water, <br />sewage, solid gas, air, or other product whatsoever and <br />without regard to the nature of material from which the <br />tubular material is fabricated; No -joint pipe and stripping <br />of same; Prefabricated manhole installer; Sandblaster <br />(nozzle person), water blasting,Porta Shot -Blast; Traffic <br />lane closure, Certified. <br />GROUP S: Blaster powder, all work of loading holes, placing <br />and blasting of all powder and explosives of whatever type, <br />regardless of method used for such loading and placing; <br />Driller: All power drills, excluding jackhammer, whether <br />core, diamond, wagon, track, multiple unit, and any and all <br />types of mechanical drills without regard to the farm of <br />motive power; Toxic waste removal; Boring system electronic <br />tracking locator <br />LAB003e O-006 01/01/2018 <br />Rates Fringes <br />Asbestos Removal Laborer ......... $ 33.19 17.78 <br />SCOPE OF WORK: Includes site mobilization, initial site <br />cleanup, site preparation, removal of asbestos containing 3A-8 rJ <br />https:Ubeta,sam.gov/wage-determiiiationlCA20190017/4/document 25/49 <br />
The URL can be used to link to this page
Your browser does not support the video tag.