My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ CENTENNIAL PARK WALKWAY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
10/15/2019
>
23A - PROJ CENTENNIAL PARK WALKWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2019 5:12:40 PM
Creation date
10/10/2019 4:55:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
10/15/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8/28/2019 beta.SAM.gov <br />material and toxic waste (including lead abatement and any <br />other toxic material), encapsulation, enclosure and <br />disposal of asbestos containing materials and toxic <br />waste(including lead abatement and any other toxic <br />materials) by hand or with equipment or machinery; <br />scaffolding, fabrication of temporary wooden barriers and <br />assembly of decontamination stations. <br />LAB00300-007 07/01/2018 <br />Residential, 3 Stories and under <br />Rates Fringes <br />Laborers <br />(1) Cleanup, Fencing <br />(Chain Link or Wood), <br />Landscaping.,,...... ........ 32.76 15.82 <br />(2) All Other Work ...... .....$ 33.76 15.82 <br />LABOO585-002 07/01/2018 <br />Residential, 4 Stories <br />VENTURA COUNTY <br />Rates Fringes <br />LABORER <br />GROUP I .............. <br />.......$ 34.24 <br />19.07 <br />GROUP 2.....................$ <br />34.79 <br />19.07 <br />GROUP 3.....................$ <br />35.34 <br />19.07 <br />GROUP 4.....................$ <br />36.89 <br />19.07 <br />GROUP 5— ...... <br />........... 37.24 <br />19,07 <br />LABORER CLASSIFICATIONS <br />GROUP 1: Cleaning and handling of panel forms; Concrete <br />screeding for rough strike -off; Concrete, water curing; <br />Demolition laborer, the cleaning of brick if performed by a <br />worker performing any other phase of demolition work, and <br />the cleaning of lumber; Fire watcher, limber, brush loader, <br />piler and debris handler; Flag person; Gas, oil and/or <br />water pipeline laborer; Laborer, asphalt -rubber material loader; Laborer, general or construction; Laborer, generals ` 3A-/}�(/q► <br />8 V <br />https://beta.sam.gov/wage-determination/CA20190017/4/document 26149 <br />
The URL can be used to link to this page
Your browser does not support the video tag.