My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C.S. LEGACY CONSTRUCTION, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
C.S. LEGACY CONSTRUCTION, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2020 7:05:25 PM
Creation date
10/23/2019 3:51:41 PM
Metadata
Fields
Template:
Contracts
Company Name
C.S. LEGACY CONSTRUCTION, INC.
Contract #
17-2674
Agency
Public Works
Council Approval Date
7/16/2019
Document Relationships
20A - AA - PROJ CENTER STREET URBAN GREENING
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2019\07/16/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.00 <br />1.01 <br />1.02 <br />1.03 <br />1910 <br />CITY OF SANTA ANA <br />SPECIFICATIONS <br />PROJECT NO.: 17-2674 <br />CENTER STREET URBAN GREENING <br />SPECIAL PROVISIONS - CONSTRUCTION <br />ROCK PRODUCTS <br />Alternate rock products, asphalt concrete, Portland cement concrete (PCC), and untreated <br />base material shall be alternate rock material — Type S per Section 400 of the Standard <br />Specifications. <br />RELATIVE COMPACTION TESTS <br />The following test methods shall be used for determining relative compaction: <br />California Test 216 (Sand Cone Method) <br />California Test 231 (Nuclear Gauge Method) <br />The Contractor will be provided with compaction test at locations deemed necessary by the <br />Engineer. If compaction fails to meet the contract specifications, then the Contractor shall <br />make the necessary adjustments and is responsible for the cost of additional compaction <br />tests until compaction per the specifications is met. <br />CLEARING AND GRUBBING <br />Clearing and Grubbing shall be performed in conformance with the provisions of Section <br />300-1 of the Standard Specifications and these Special Provisions. <br />The following is added to Section 300-1.2 Preservation of Property: <br />Modify and/or repair existing sprinklers in project area that are damaged due to the <br />Contractor's operation within 24 hours. <br />UNCLASSIFIED EXCAVATION <br />This section shall conform to Subsection 300-2 and 300-4 of the Standard Specifications <br />and these Special Provisions. <br />Unclassified excavation shall consist of all excavation including sawcutting and removal <br />of roadways, bituminous pavement, concrete pavement, pavement fabric, and the removal <br />of curbs, sidewalks, driveways, alleys, cross -gutters, earthwork, sod, etc. as shown on the <br />plans. <br />Any cores provided are included in the Appendix for reference purposes only and are not <br />part of the contract documents. The AGENCY will not be held responsible for existing <br />conditions that differ from any core logs that may be provided. It is the Contractor's option <br />to take his/her own core samples to verify the existing conditions. <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.