My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C.S. LEGACY CONSTRUCTION, INC.
Clerk
>
Contracts / Agreements
>
PROJECTS
>
C.S. LEGACY CONSTRUCTION, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2020 7:05:25 PM
Creation date
10/23/2019 3:51:41 PM
Metadata
Fields
Template:
Contracts
Company Name
C.S. LEGACY CONSTRUCTION, INC.
Contract #
17-2674
Agency
Public Works
Council Approval Date
7/16/2019
Document Relationships
20A - AA - PROJ CENTER STREET URBAN GREENING
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2019\07/16/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />BID PROPOSAL <br />PROJECT NO.: 17-2674 <br />CENTER STREET URBAN GREENING <br />TOTAL BASE BID <br />S <br />c�c� p -1 3 . o.S <br />TOTAL ADD ALTERNATE BID 1 <br />$ <br />TOTAL ADD ALTERNATE BID 2 <br />$ <br />9 tDl 9 C0 <br />TOTAL ADD ALTERNATE BID 3 <br />$ <br />1 tp OSO . c5b <br />TOTAL ADD ALTERNATE BID 4 <br />$ <br />I <br />TOTAL ADD ALTERNATE BID 5 <br />$ <br />The lowest respansible bidder shall be selected based on the total base bid. The City reserves the right to <br />award the Base Bid, and any, all, or none of the add-altemate bid items (if any). <br />The quantity for this bid item is shown for bid comparison only. This bid item shall not be subject to <br />the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual amount for this <br />item will be dictated by the actual quantity used, and the Agency reserves the right to increase or <br />decrease the quantity of this item accordingly. <br />TIME FOR COMPLETION OF RAPROVEMENTS AND LIOUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown above, <br />within sixty (60) working days after the commencement date stated in the Notice to Proceed. <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard <br />Specifications, shall be $1,000 per calendar day. <br />The undersigned bidder hereby proposes to complete all requirements and items outlined in the most current <br />Construction General Permit, within sixty (60) working days after the date stated in the Notice of <br />Completion. <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard <br />Specifications, shall be $1,000 per calendar day./ <br />NameofFirm <br />Signature of BIDDER <br />-TYest5,u�t�.2r, {�nng(ha r <br />Title T Vr 61chnT (nr nDa Cir �v L <br />(If an individual, so state. If a fib'Jr co-partne ship, state the firm name and give the names of all <br />individual co partners composing the firm. If a corporation, state legal name of corporation, and names <br />of President, Secr Treasurer Manager, thereof.) <br />)` <br />P,i&hay l Gon7slUk ' S cfAak( <br />P-5 ofP-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.