My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BUTIER ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
B
>
BUTIER ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2019 5:23:36 PM
Creation date
10/23/2019 5:19:58 PM
Metadata
Fields
Template:
Contracts
Company Name
BUTIER ENGINEERING, INC.
Contract #
A-2019-171
Agency
PUBLIC WORKS
Council Approval Date
10/1/2019
Expiration Date
9/30/2022
Insurance Exp Date
6/25/2020
Destruction Year
2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IBU TIER <br />C0401110 nMamie,. 0.ue.Alnp Anyinm"A <br />EDUCATION <br />B.S„ Engineering <br />Technology—Constru ctl on, <br />California State Polytechnic <br />University, Pomona, 2000 <br />AREAS of <br />EXPERTISE <br />CPM Project Scheduling <br />Cost Control <br />Quality Control <br />Construction & Specialty <br />Trade Estimating <br />Cost Valuation <br />Value Engineering <br />Construction Inspections <br />Surveying <br />Structural Design <br />Change Order Negotiation <br />Cost Segregation Studies <br />Project Organization <br />Engineering Management <br />Owner Presentations <br />Project Review <br />YEARS WITH FIRM <br />4 yea rs <br />AVAILABILITY <br />20% <br />Bryan Wilson <br />Contract Administrator <br />Professional Summary <br />Mr. Wilson has over 18 years of construction estimating, cost review, <br />inspection, and engineering management experience. He has analyzed and <br />reviewed cost estimates for hundreds of projects ranging from underground <br />pipelines to high-rise office buildings, These projects involved the training and <br />management of engineers and estimators to determine and track construction <br />costs and activities. Mr. Wilson's detailed estimating experience covers all <br />aspects of building and heavy/civil design and construction, including <br />earthwork, structural, mechanical, electrical, and plumbing components. He <br />has conducted numerous physical inspections in order to verify the accuracy <br />and scope of quantities and cost estimates derived from construction <br />blueprints. He also has experience in organizing and tracking requests for <br />information (RFI), project scheduling, negotiating construction change orders, <br />and value engineering analyses. <br />Mr. Wilson's range of professional experience includes working for and with <br />construction management firms, general contractors, architecture and <br />engineering firms, and public accounting and consulting firms. He has also <br />provided asset valuation and classification consulting services to real estate <br />appraisers and construction companies. He has prepared construction cost <br />estimate studies for federal tax depreciation classification.and successfully <br />defended these studies when audited by the Internal Revenue Service. <br />Project Experience <br />Field Engineer/Document Control Specialist, Mid -Basin Injection; <br />Centennial Park Project; Santa Ana, CA; Orange County Water District <br />(Completion: 2018; Value; $23.2 million) —Mr. Wilson is performing as the <br />Document Control Specialist for the Mid -Basin Injection project, which <br />consists of the construction of the following: four groundwater injection wells <br />In below grade vaults, Including all related appurtenances within Centennial <br />Park; a monitoring well at the Heritage Museum site; a purified recycled water <br />injection supply pipeline approximately 5,000 feet long that connects to the <br />District's existing Groundwater Replenishment System (GWRS) pipeline and <br />crosses the Santa Ana River; a backflush discharge pipeline approximately <br />4,000 feet long that discharges to the Greenville -Banning Channel and <br />Centennial Park Lake; installation of submersible pumps within the four <br />Injection wells; replacement of approximately 9.8 acres of paving within the <br />Park; demolishing an existing City of Santa Ana restroom facility; and <br />constructing two new buildings with shared City and District uses. Mr. Burce <br />is coordinating closely with the City of Santa Ana, Santa Ana Unified School <br />District, Heritage Museum, and state and federal agencies. <br />Field Engineer/Assistant Resident Engineer, Santa Ana River Enhanced <br />Recharge Phase 1A Sedimentation Basin and Pipeline; San Bernardino <br />Valley Municipal Water District (Est. Completion: 2018; Value: $14 <br />mill ion)---Butier (Prime) and GHD (Sub) are providing design, engineering, <br />and CM services for the SARER Phase 1A project, which is located in an <br />undeveloped area near the upper reaches of the Santa Ana River. A new <br />diversion structure and inlet channel is being constructed to divert water to <br />
The URL can be used to link to this page
Your browser does not support the video tag.