My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BUTIER ENGINEERING, INC.
Clerk
>
Contracts / Agreements
>
B
>
BUTIER ENGINEERING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2019 5:23:36 PM
Creation date
10/23/2019 5:19:58 PM
Metadata
Fields
Template:
Contracts
Company Name
BUTIER ENGINEERING, INC.
Contract #
A-2019-171
Agency
PUBLIC WORKS
Council Approval Date
10/1/2019
Expiration Date
9/30/2022
Insurance Exp Date
6/25/2020
Destruction Year
2027
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section D. Relevant Project Experience <br />Project Name / <br />Project Desciption <br />Location / Reference <br />Mid -Basin Injection Wells— <br />Butter Engineering, Inc. is providing <br />Centennial Park Project; <br />constructability review, project coordination, <br />Santa Ana, CA <br />resident engineering, and construction Inspection <br />Orange County <br />services for the Mid -Basin Injection Wells Project <br />Water District <br />located within the City of Santa Ana's 87-acre <br />Centennial Park. The wells will be used to directly <br />Ben Smith, P.E. <br />inject product water from the District's <br />Project Manager <br />Groundwater Replenishment System (GWRS) <br />Tel: (714) 378-3211 <br />Into the principal groundwater aquifer in the <br />bsmith@ocwd.com <br />central portion of the Orange County groundwater basin. The project requires <br />Value: $23.2 million <br />close coordination with the City of Santa Ana, Santa Ana Unified School District, <br />Completion:2019 <br />Heritage Museum, and state and federal agencies. The project consists of <br />construction of the following: <br />Proposed Key Personnel <br />+ Four (4) groundwater Injection wells In below grade vaults (1,200 feet deep) <br />Mark Butler, Casey Harris, <br />and all related appurtenances <br />Vladimir Burce, P,E„ and <br />+ SR-13 monitoring well at the Heritage Museum site <br />Bryan Wilson <br />+ 5,500 LF of purified recycled water injection supply pipeline that connects to <br />the District's existing GWRS pipeline and crosses the Santa Ana River <br />+ 4,200 LF of backflush discharge pipeline that discharges to the Greenville - <br />Banning Channel and Centennial Park Lake <br />+ Two new buildings with shared City of Santa Ana and District uses <br />+ Installation of submersible pumps within the four Injection wells <br />+ Replacement of 9.6 acres of paving with the Park <br />+ Demolishing an existing City of Santa Ana restroom facility <br />Phase Aquippvenuo ng; <br />Phase II Equipping; <br />Butler provided project / construction <br />Tustin, CA <br />management and Inspection services for the <br />Edinger Avenue Well . Phase II Equipping <br />City of Tustin, Public Works <br />Project. Construction of the building and <br />Ken Nishikawa, Deputy <br />equipping of the pump included the following: <br />Director of Public <br />installation of a 225 LF of 12-inch diameter CML <br />Works/Engineering <br />ductile iron pipe discharge water line; connection <br />Tel: (714) 573-3389 <br />to 12-Inch ductile Iron watermain; installation of <br />knishikawa@tustinca.org <br />162 LF of 18-inch diameter C-905 drain line; connection to the existing storm <br />Value: $4,103,650 <br />drain; placement of new onsite sewer manhole; installation of 76 LF of 8-inch <br />diameter SDR 26 sewer lateral; connection to existing OCSD sewer manhole; and <br />Completion: 2016 <br />erection of 2,376 SF of CMU block wall with a metal roof building to enclose the <br />Proposed Key Personnel <br />well pump, electrical equipment and chlorine room. <br />Mark Butler and <br />Kyle Morgheim, P.E. <br />The project is part of the City of Tustin's Water Services Division, which is <br />responsible for the production and safe delivery of domestic water to more than <br />14,100 service connections through approximately 172 miles of water mains. <br />Butler staff coordinated with several agencies Including the City of Tustin, City of <br />Santa Ana, and Caltrans. <br />BU" IER D. RELEVANT PROJECT EXPERIIENCE <br />
The URL can be used to link to this page
Your browser does not support the video tag.