Laserfiche WebLink
Station and Vista / <br />Carlsbad Interceptor Sewer <br />Replacement; Vista and <br />Carlsbad, CA <br />City of Vista <br />Greg Mayer, P.E. <br />City Engineer <br />Tel: (760) 726-1340 x1206 <br />gmayer@ci.vista.ca.us <br />Value: $64.2 million <br />Completion: 2018 <br />Proposed Key Personnel <br />Mark Butler <br />City of Santa Ana, Public Works Agency <br />Constructlon Engineering SerWoos for the <br />San Lorenzo Sewage Llft Station, RFA No. 18.049 <br />Butler Engineering, Inc, performed as <br />the Owner's Representative for the <br />construction of the sewer lift station and <br />Interceptor sewer reaches. This Is a joint <br />sewer project with the City of Vista and <br />the City of Carlsbad to replace existing <br />facilities, Increase sewer capacity and <br />Improve reliability within the lower <br />portion of the sewer system, The project <br />beings at the north shore of the Ague <br />Hedlonda Lagoon in Carlsbad and <br />extends a distance of 23 miles to the <br />Encina Water Pollution Control Facility. <br />Major project components Include the <br />following; <br />Removal and replacement of the <br />existing wood trestle sewer support <br />bridge across the lagoon with a new <br />steel support bridge. The new bridge <br />will provide vehicle access to sewer <br />facilities. The existing 42-inch <br />diameter sewer pipe along the <br />bridge will be replaced with a new <br />54-inch pipe. <br />Removal and replacement of the <br />existing Agua Hacienda lift station. <br />The new structure will house <br />replacement motors and pumps, as <br />well as new system enhancements <br />Including an emergency generator <br />and bypass motors and pumps, an electrical control building, and odor <br />control facilities. <br />Construction of a new 30-inch diameter force main and a new 54-Inch <br />diameter gravity sewer line to increase system capacity and reliability. The <br />force main will provide 4,000 linear feet of high density polyethylene pipe <br />parallel to an existing line and will connect into 7,000 linear feet of new 54- <br />inch diameter gravity sewer to be constructed in Avenida Eneinas from <br />Cannon Road to the Encina Water Pollution Control Facility. <br />D. RELEVANT PROJECT EXPERIENCE <br />