• Photographic Records: Provide weekly <br />photographic/digital records of the project <br />during construction, Log construction <br />digital photographs on a daily basis. A <br />digital photographic library will be <br />maintained of significant construction <br />activities. The photographs will be labeled <br />with the date, location, and narrative <br />information. Additional digital photographs <br />will be taken of change order and claim <br />Items, and any special or unique <br />conditions as they arise. The photographic <br />library will be turned over to the City at the <br />completion of the construction contract. <br />14. Special inspection I Materials Testing <br />The PM and Lead Inspector will facilitate and <br />coordinate Inspection by representatives of <br />other agencies and schedule and coordinate <br />special inspection and materials testing. <br />C. Project Close -Out <br />1. Detailed Project punch Lists <br />The Butier Team will prepare a project punch <br />list at substantial completion and coordinate <br />the correction of deficiencies by the <br />Contractor. Upon correction of deficiencies, <br />the PM will coordinate and conduct a final <br />walk-through prior to the acceptance of work <br />with the Design Engineer, City's Construction <br />Manager, and other staff as directed. <br />Z. Final Payment Requests <br />The PM will verify that the Contractor has <br />made all payments to the subcontractors and <br />vendors and that any stop notices or liens <br />have been released. The PM will obtain a <br />Conditional Waiver of Lien from the Contractor <br />prior to recommending final payment. <br />$. Verify Contractors Project Record <br />Drawings <br />The PM will review the Contractor's project <br />record drawings for completeness, <br />4. Compile and Submit O & M Manuals <br />The PM will compile and submit operation and <br />maintenance manuals, instruction manuals, <br />parts lists, spare parts, and warranties for <br />equipment procured. The PM will collect <br />City of Santa Ana, Public Works Agency <br />Constriction Engineering Services for the <br />San Lorenzo Sewage Lift Station, RFP No. 1M49 <br />relevant data and information from the <br />Contractor and material/equipment supplies <br />and assist the Design Engineer in developing <br />a comprehensive O&M Manual. <br />6. Final Report <br />The PM will prepare and submit a final <br />progress report to the City no later than 60 <br />calendar days following the filing of the Notice <br />of Completion. The report will include a <br />complete overview of the contract, <br />Contractor's performance, accomplishments, <br />preliminary and final project costs, cash flows, <br />schedules, and recommendations for <br />alleviating problems experienced on the <br />project. <br />6. Turn Over All Documents and Files <br />The Butler Team will furnish all original project <br />documents and final reports to the City's CM <br />within 60 calendar days following filing of the <br />Notice of Completion. The documents will be <br />delivered to the City in a form and fashion <br />acceptable to the City. The files will also be <br />scanned and provided to the City in electronic <br />format on CD-ROM (two copies) labeled with <br />the project name. <br />F. SCOPE -OF & SCHEDULE <br />