My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARNAZ ENGINEERING CONTRACTORS, INC. (5)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ARNAZ ENGINEERING CONTRACTORS, INC. (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2019 1:41:16 PM
Creation date
10/28/2019 1:40:00 PM
Metadata
Fields
Template:
Contracts
Company Name
ARNAZ ENGINEERING CONTRACTORS, INC.
Contract #
17-2675
Agency
Public Works
Council Approval Date
7/16/2019
Document Relationships
23B - PROJ - CIVIC CENTER STORMWATER LIFT STATIONS
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2019\07/16/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of <br />Santa Ana <br />Page 2 <br />Civic Center Slormwater Lift Station Renovation (17-2675), bidding on May 1, 2019 2:00 <br />PM (Pacific) <br />Printed 05/2a/2019 <br />Bid Results <br />Type <br />Item Code UOM City <br />Unit Price <br />Line Total Comment <br />4 <br />Construct structural Improvements <br />LS 1 <br />$45,000.00 <br />$46,000.00 <br />5 <br />Construct precast concrete stormwater treatment device <br />LS 1 <br />$40,000.00 <br />$40,000.00 <br />6 <br />Furnish and Install all mechanical piping and equipment within the Santa Ana Lift <br />Station and the Flower Lift Station <br />LS 1 <br />$246,000.00 <br />$245,000.00 <br />7 <br />Furnish and install all electrical equipment for the Santa Ana Lift Station and the Flower Lift Station <br />LS 1 <br />$360,000.00 <br />$360,000.00 <br />8 <br />Excavation, haul, and disposal of excess material-M_._ <br />___.. .___..._._......._.. ,�. <br />LS 1 <br />$30,000.00 <br />$30,000.00 <br />8 <br />Temporary Pumping <br />__----_ ..-._._.m. <br />LS 1 <br />$16,000.00 <br />$15,000.00 <br />10 <br />Programming and cloud based SCADA sysems integration <br />LS 1 <br />$35,000.00 <br />$35,000.00 <br />11 <br />Commissioning, start-up, testing, demonstration, training and close-out <br />LS 1 <br />$35,000.00 <br />$35,000.00 <br />72 <br />Demobilization <br />LS 1 <br />$5,000.00 <br />$5,000.00 <br />13 <br />Labor Agreement Oversight <br />LS 1 <br />$10.000.00 <br />$10,000.00 <br />14 <br />Dry Well <br />..._.._....-. <br />EA 5 <br />$5,000.00 <br />$25,000.00 <br />Subtotal <br />$1,022,000.00 <br />Total <br />$1,022,000.00 <br />PlanetBids, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.