My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARNAZ ENGINEERING CONTRACTORS, INC. (5)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ARNAZ ENGINEERING CONTRACTORS, INC. (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/28/2019 1:41:16 PM
Creation date
10/28/2019 1:40:00 PM
Metadata
Fields
Template:
Contracts
Company Name
ARNAZ ENGINEERING CONTRACTORS, INC.
Contract #
17-2675
Agency
Public Works
Council Approval Date
7/16/2019
Document Relationships
23B - PROJ - CIVIC CENTER STORMWATER LIFT STATIONS
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2019\07/16/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL <br />PROJECT NO.: 17-2675 <br />CIVIC CENTER STORMWATER LIFT STATION RENOVATION <br />BID PROPOSAL <br />TO: CITY COUNCIL OF THE CITY OF SANTA ANA <br />FROM: Arnaz Engineering Contractors, Inc. <br />REQUIREMENT: <br />The undersigned bidder declares that they have carefully examined the location of the proposed <br />work, that they have examined the Contract Documents in its entirety and hereby proposes to <br />furnish all material and do all the work required to complete the said work in accordance with said <br />plans (if any) and the specifications for the unit price(s) or lump sum(s) set forth in the following <br />schedule: <br />Item <br />Description <br />Mobilization (not to exceed 5% of <br />1 <br />total bid) <br />Construct AC pavement, sitework, <br />2 <br />fences, gates and miscellaneous <br />concrete <br />Construct yard piping and utilities <br />3 <br />Construct structural improvements <br />4 <br />Construct precast concrete stormwater <br />5 <br />treatment device <br />Furnish and install all mechanical <br />6 <br />piping and equipment within the Santa <br />Ana Lift Station and the Flower Litt <br />Station <br />Furnish and install all electrical <br />7 <br />equipment for the Santa Ana Lift <br />Station and the Flower Lift Station <br />Excavation, haul, and disposal of <br />8 <br />excess material <br />Temporary Pumping <br />9 <br />Programming mid cloud based <br />10 <br />SCADA systems integration <br />Commissioning, start-up, testing, <br />11 <br />demonstration, training and close-out <br />Demobilization <br />12 <br />Labor Agreement Oversight <br />13 <br />Qty Unit Unit Price Amount <br />1 LS $ $ <br />1 LS $ $ <br />1 LS $ $ <br />1 LS $ $ <br />1 1,S $ $ <br />1 LS $ $ <br />1 LS $ $ <br />1 LS <br />1 LS <br />1 LS <br />1 LS <br />LS <br />1 LS <br />$ 1.0,000 $ 10,000 <br />P-1 ofP-16 <br />sti �brd� � id <br />
The URL can be used to link to this page
Your browser does not support the video tag.