My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. NOBLE COMPANY (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
R.J. NOBLE COMPANY (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2021 4:33:14 PM
Creation date
10/29/2019 11:20:51 AM
Metadata
Fields
Template:
Contracts
Company Name
R.J. NOBLE COMPANY
Contract #
Various
Agency
Public Works
Council Approval Date
8/20/2019
Document Relationships
23C - CHANNEL IMPROV
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2019\08/20/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />City of Santa Ana <br />Page 2 <br />ALTON REHABILITATION FROM RAITT TO 13RISTOL & ALTON DRAINAGE REPAIR AT D•03 CHANNEL (19.6941 & Printed 07/2512019 <br />Bid Results <br />Type <br />Item Code <br />u0M <br />City <br />Unit Price <br />Ltns Total Comment <br />3 <br />Asphalt Rubber Hot MIx" <br />TN <br />1920 <br />$86.00 <br />$163,20000 <br />4 <br />ARAM - <br />BY <br />16800 <br />$7.00 <br />$117,600.00 <br />5 <br />Crack Seal" <br />........... . <br />GAL <br />350 <br />$48.00 <br />$16,800.00 <br />6 <br />Cold Milling(3"-4")` <br />SF <br />136000 <br />$0.28 <br />$38,080.00 <br />7 <br />PCC Sidewalk (41 <br />SF <br />3100 <br />$6.25 <br />$16,276.00 <br />8 <br />PCC Driveway Approach (Commercial = S") <br />SF <br />400 <br />$9.00 <br />$3.600.00 <br />9 <br />PCC Curb Ramp <br />SF <br />1500 <br />$12.00 <br />$18,000.00 <br />10 <br />PCC Curb and Gutter (Type A•2-8) <br />LF <br />560 <br />$30.00 <br />$16,800.00 <br />11 <br />RootShave <br />EA <br />4 <br />$300.00 <br />$1,200.00 <br />12 <br />Adjust Water Valve Frame and Cover to Finished Grade <br />EA <br />11 <br />$t300,00 <br />$14,300.00 <br />13 <br />Adjust Sewer and Drainage Manhole to Finished Grade <br />EA <br />3 <br />$1,300.00 <br />$3,000.00 <br />14 <br />Fumish and Install New 96 Pullbox <br />EA <br />14 <br />$900.00 <br />$12,600.00 <br />15 <br />Furnish and Install New #6 Pullbox Traf a Rated <br />EA <br />2 <br />$1,000.00 <br />$2,000.00 <br />16 <br />Furnish and Install Traffic Loops Type E t <br />EA <br />30 <br />$225.00 <br />$6,750.00 <br />17 <br />Temporary Construction Sign <br />EA <br />2 <br />$525.00 <br />$1.050.00 <br />18 <br />Project Advertisement Sign <br />EA <br />2 <br />$800.00 <br />$1,600.00 <br />PlanmtSids, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.