My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
G.J. GENTRY GENERAL ENGINEERING, INC. (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
G.J. GENTRY GENERAL ENGINEERING, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 11:10:53 AM
Creation date
10/29/2019 11:39:47 AM
Metadata
Fields
Template:
Contracts
Company Name
G.J. GENTRY GENERAL ENGINEERING, INC.
Contract #
P 17-6437
Agency
Public Works
Council Approval Date
8/20/2019
Insurance Exp Date
2/11/2022
Document Relationships
23A - PROJ SAFE ROUTE TO SCHOOL
(Amends)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2019\09/03/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL ADDENDUM FOUR <br />PROJECT NO.: 17-6437 <br />CITYWIDE SEWER MAIN IMPROVEMENTS <br />TOTAL BASE BID $ 1,269,089 84 <br />The lowest responsible bidder shall be selected based on the total base bid. The City reserves the <br />right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). If add <br />alternate one bid is awarded it will replace bid item 7 and up to 37 units of bid item 6. <br />The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown <br />above, within One Hundred fifteen (115) working days after the commencement date stated in the <br />Notice to Proceed. <br />15 — Working Days for exploratory potholing and data gathering <br />• 100 —Working Days for project construction <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard <br />Specifications, shall be $1,000 per calendar day. <br />Name of Firm G.J. Gentry General Engineering, Inc. <br />Signature of BIDDER <br />Title C611k E so ww+ww <br />(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of <br />all individual co-partners composing the firm. If a corporation, state legal name of corporation, <br />and names of President, Secretary, Treasurer and Manager, thereof.) <br />P-3 of P-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.