My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
G.J. GENTRY GENERAL ENGINEERING, INC. (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
G.J. GENTRY GENERAL ENGINEERING, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2022 11:10:53 AM
Creation date
10/29/2019 11:39:47 AM
Metadata
Fields
Template:
Contracts
Company Name
G.J. GENTRY GENERAL ENGINEERING, INC.
Contract #
P 17-6437
Agency
Public Works
Council Approval Date
8/20/2019
Insurance Exp Date
2/11/2022
Document Relationships
23A - PROJ SAFE ROUTE TO SCHOOL
(Amends)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2019\09/03/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project No. 17-6437; Citywide Sewer Main Improvements Project Change Order Number 2 <br />To G.J. Gentry General Engineering Inc. Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included in the plans and <br />specifications on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED UNIT PRICE <br />Add the following line items per PCO #01: <br />ITEM ESTIMATED <br /># DESCRIPTION QUANTITY <br />J <br />25 Remove & replace concrete per city 4,986 SF $13.50 <br />trench standard with #4 dowels 16" off <br />center each way (OCEW) on Pomona <br />Street. <br />26 Remove & replace concrete per city 1,308 SF $13.50 <br />trench standard with #4 dowels 16" <br />OCEW on Gainsay Street. <br />Remove & replace PCC apron on <br />27 Myrtle eastside of Garnsey with #4 <br />Dowels 16" OCEW. 324 SF $13.50 <br />Page 1 of 2 <br />ESTIMATED <br />$17,658.00 <br />ESTIMATED TOTAL: $89,343.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.