My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARAMEXX CONSTRUCTION (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ARAMEXX CONSTRUCTION (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2021 4:23:21 PM
Creation date
10/29/2019 12:09:24 PM
Metadata
Fields
Template:
Contracts
Company Name
ARAMEXX CONSTRUCTION
Contract #
Various
Agency
Public Works
Council Approval Date
9/3/2019
Document Relationships
23A - SEWER MAIN IMPROV PROJ
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2019\08/20/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Santa Ana <br />Page 2 <br />REBID: Project 17-6801 CIVIC CENTER BIKE BLVD & Project 17.0886 SEPULVEDA SAFE ROUTES TO SCHOOL <br />Printed 08/07019 <br />Bid Results <br />EXHIBIT A <br />Type <br />Item Code <br />UOM <br />sty <br />Unit Pdae <br />Line Total Comment <br />3 <br />Cold Mllling" <br />SP <br />3200 <br />$2.00 <br />$6,400.00 <br />...... <br />4 <br />Construct FCC Sidewalk (T®40)' <br />SF <br />37600 <br />$0.00 <br />$226,800.00 <br />6 <br />Construct FCC Driveway (T-8)' <br />SF <br />2600 <br />$9.00 <br />$2$,400,00 <br />S <br />Construct PCC Curb Ramp" <br />SF <br />17800 <br />$9,00 <br />$160,200.00 <br />7 <br />Construct PCC Curb and Ginter (Type A-2-8) <br />LF <br />4900 <br />$34.00 <br />$180,000.00 <br />8 <br />Construct FCC Curb only (B-1)' <br />LF <br />500 <br />$19.00 <br />$9,600.00 <br />9 <br />Construct PCC Cross Gulter (Localr <br />SF <br />70M <br />$12.00 <br />$84.000.00 <br />10 <br />Construct Bus Pad (Including Reber Dowels as -needed)' <br />SF <br />5800 <br />$23.00 <br />$128,800.00 <br />11 <br />Construct FCC Modified Curb (Traftlo Circle)' <br />9F <br />880 <br />$23.00 <br />$20,240.00 <br />..12 <br />Construct Color Stamped Concrete Including robar (T-10")" <br />SF <br />800 <br />$20.00 <br />$16,000,00 <br />13 <br />Root Shave <br />EA <br />6 <br />$400.W <br />$2,400.00 <br />14 <br />Adjust Manhole Frame and Cover to Grade <br />,..... ,..... <br />EA <br />......... ...... . <br />9 <br />... , <br />$1.600.00 <br />$14.400.00 <br />15 <br />.,,,.,_..._........... ... ..,,.. .. ... .._ ,........... <br />Adjust Water Valve Frame and Cover to Grade <br />FA <br />27 <br />$460.00 <br />$12,160.00 <br />18 <br />Furnish and Install New Fire Hydrant <br />EA <br />4 <br />$12,000.00 <br />$48,000.00 <br />17 <br />Abandon Water Valve <br />EA <br />4 <br />$3,500.0o <br />$14,000.00 <br />18 <br />Furnish and Install Now Water Meter Box and Cover to Grade <br />EA <br />6 <br />$500.00 <br />$2,600.00 <br />PlanetBlds,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.