My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARAMEXX CONSTRUCTION (2)
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ARAMEXX CONSTRUCTION (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/23/2021 4:23:21 PM
Creation date
10/29/2019 12:09:24 PM
Metadata
Fields
Template:
Contracts
Company Name
ARAMEXX CONSTRUCTION
Contract #
Various
Agency
Public Works
Council Approval Date
9/3/2019
Document Relationships
23A - SEWER MAIN IMPROV PROJ
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2019\08/20/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PROPOSAL REBID <br />PROJECT NO.: 17-6801 CIVIC CENTER BIKE BOULEVARD ATPL-5063(178) <br />PROJECT NO.: 17-6886 SAFE ROUTE TO SCHOOL ENHANCEMENTS FOREXH BIT A <br />SEPULVEDA ELEMENTARY SCHOOL ATPL-5063(174) <br />The lowest responsible bidder shall be selected based on the Total Base Bid. The City reserves <br />the right to award the Base Bid, and any, all, or none of the add -alternate bid items (if any). <br />* The quantity for this bid item is shown for bid comparison only. This bid item shall not be <br />subject to the "25%" limit as stated in Section 3-2 of the Standard Specifications. The actual <br />amount for this item will be dictated by the actual quantity used, and the Agency reserves the <br />right to increase or decrease the quantity of this item accordingly. <br />j This bid item is considered a Specialty Item per Section 2-3.2 of the Standard Specifications. <br />TIME FOR COMPLETION OF IMPROVEMENTS AND LIQUIDATED DAMAGES <br />The undersigned bidder hereby proposes to complete the Work for the total base bid amount shown <br />above, within 200 working days after the commencement date stated in the Notice to Proceed. The <br />first 140 working days of which is for construction, and the last 60 working days for the <br />landscaping and irrigation maintenance period. The contractor shall order any material <br />specified in the contract document requiring a long lead-time immediately after the Notice <br />to Proceed. The lead —time for the items is including in the total working days. <br />The liquidated damages amount, in lieu of the amount specified in Subsection 6-9 of the Standard <br />Specifications, shall be $1,500 per calendar day. <br />Name of Firm AramexxGTtq54nc., <br />Signature of BIDDER ! ', <br />Salim Samour - President, Salim-Samour - Sec alim Samour - Treasurer, Salim Samour - Manager <br />Title President <br />(If an individual, so state. If a firm or co -partnership, state the firm name and give the names of <br />all individual co-partners composing the firm. If a corporation, state legal name of corporation, <br />and names of President, Secretary, Treasurer and Manager, thereof.) <br />P-5 of P-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.