My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ROCKFORCE CONSTRUCTION, LLC
Clerk
>
Contracts / Agreements
>
PROJECTS
>
ROCKFORCE CONSTRUCTION, LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/9/2024 12:53:26 PM
Creation date
10/29/2019 3:20:21 PM
Metadata
Fields
Template:
Contracts
Company Name
ROCKFORCE CONSTRUCTION, LLC
Contract #
P 06-3510
Agency
Public Works
Council Approval Date
10/1/2019
Document Relationships
23A - PROJ - BRISTOL ST REHAB
(Attachment)
Path:
\Agenda Packets / Staff Reports\City Council (2004 - Present)\2019\10/01/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
81
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF SANTA ANA <br />PUBLIC WORKS AGENCY <br />CONTRACT CHANGE ORDER <br />Project Number Project No. 06-3510: Change Order Number 1 <br />San Lorenzo Lift Station Project <br />To RockForce Construction Contractor <br />You are hereby directed to make the herein changes from the plans and specifications or do the following described work not included In the plans and specifications <br />on this contract. <br />NOTE: THIS CHANGE ORDER IS NOT EFFECTIVE UNTIL APPROVED BY THE CITY COUNCIL OR CITY MANAGER. <br />Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance wilt be made for idle time. <br />Change requested by PUBLIC WORKS AGENCY <br />EXTRA WORK AT AGREED PRICE <br />1. Temporary Construction Agreement between RockForce Construction and Mr. Joe McDonough at <br />2810 S. Baker Street, Santa Ana. <br />AGREED PRICE: $40,780.00 <br />2. Contract Extension for Excusable, Non-Compensable Delays due to Fabrication of Stainless Steel <br />Wall Sleeve Penetrations, and 2020 Calendar Year Rain Days — total of Fifty -Two (52) Working Days. <br />AGREED PRICE: $0.00 <br />3. Electrical Services Installation — materials, equipment, and labor — for 0.5-Ton Overhead Crane and <br />Manual Chain Hoist under Owner's Directive; and additional Five (5) Working Days, <br />AGREED PRICE: $19,125.85 <br />4. Additional Hardware Improvements to Exit Devices and Mortice Locks — material costs, per response <br />to Request for Information (RFI) #023. <br />AGREED PRICE: $1,897.60 <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.