My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23A - PROJ - SEWER
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2019
>
11/05/2019
>
23A - PROJ - SEWER
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2019 12:52:39 PM
Creation date
10/30/2019 11:41:35 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23A
Date
11/5/2019
Destruction Year
2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REQUEST FOR <br />COUNCIL ACTION <br />CITY COUNCIL MEETING DATE: <br />NOVEMBER 5, 2019 <br />TITLE: <br />AMEND THE CONSTRUCTION CONTRACT <br />WITH EBS GENERAL ENGINEERING, INC., <br />BY $248,000 FOR A NEW CONTRACT <br />DELIVERY TOTAL OF $1,340,874 TO <br />CONSTRUCT PAVEMENT IMPROVEMENTS <br />FOR THE RESIDENTIAL STREET REPAIR <br />AND ALLEY IMPROVEMENT PROJECT <br />ASSOCIATED WITH THE CITYWIDE SEWER <br />MAIN IMPROVEMENT PROJECT AT <br />POMONA STREET (PROJECT NOS. 18-7526, <br />18-7527,18-6910,17-6437) <br />{STRATEGIC PLAN NOS. 6, 1B; 1C; 1G} <br />/s/ Kristine Ridae <br />CITY MANAGER <br />Idx9101LTA ILTA 121ki11]2111111F[QIIs] ►I <br />CLERK OF COUNCIL USE ONLY: <br />APPROVED <br />❑ As Recommended <br />❑ As Amended <br />❑ Ordinance on 1sl Reading <br />❑ Ordinance on 2o° Reading <br />❑ Implementing Resolution <br />❑ Set Public Hearing For <br />CONTINUED TO <br />1�1��►1�1�1:3q:7 <br />Approve an increase of $248,000 to the EBS General Engineering, Inc., construction contract to <br />perform additional paving improvements within the Residential Street Repair and Alley <br />Improvement Project area related to sewer main replacement work on Pomona Street from Main <br />Street to Maple Street as performed under the Citywide Sewer Main Improvement Project. <br />DISCUSSION <br />On May 21, 2019, City Council awarded a construction contract to EBS General Engineering, Inc., <br />to construct residential street repairs in the Heninger Park and Madison Park neighborhoods <br />(Exhibit 1). The work is pursuant to the Residential Street Repair Program and its focus is to repair <br />high priority streets using the City's Pavement Management System. On August 20, 2019, City <br />Council awarded a construction contract to G.J. Gentry General Engineering, Inc., to perform <br />Citywide sewer main improvements that included the replacement of sewer mains on Pomona <br />Street from Main Street to Maple Street (Exhibit 1). Both projects are included in the City's Council - <br />approved Capital Improvement Program (Fiscal Years 2017-18 and 2016-17, respectively) and are <br />currently under construction. <br />The residential street repair project improvements include performing localized concrete pavement <br />reconstruction; replacing damaged concrete curbs, gutters, sidewalks, cross gutters, and curb <br />ramps; and sealing cracks to prevent deterioration from water infiltration. With the section of the <br />Citywide Sewer Main Improvement Project being in the same area, by adding funding as <br />23A-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.